Al Firdaus Kargıcak Residences

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Kurt Safir Construction & Development Company

Project Gallery

Al Firdaus Kargıcak Residences


We present to attention a grandiose project of a premium residential complex Al Firdaus from the construction company Kurt Safir.

A residential complex with a unique infrastructure, located in a picturesque area of Alanya, Kargicak. Thanks to the successful choice of land, namely one of the hills at the foot of the Taurus Mountains, absolutely all apartments offer a stunning view of the Mediterranean Sea, the city and the ancient fortress of Alanya. Kargicak is an elite area, located just 20 minutes from the center of Alanya, between the Taurus mountain range and the Mediterranean Sea.

Al Firdaus (means "the highest degree of paradise") is an excellent choice for those who appreciate a luxurious lifestyle and a private, delicate pastime.

The main priority of the complex is the halal concept, special infrastructure and atmosphere for clients professing Islam. In this project, taking into account the rules of privacy and traditions, all conditions for high-quality, comfortable rest and life of Muslim families.

The residence will be an ideal option for a certain range of clients who, due to religious and ethical reasons, cannot accommodate in classic residential complexes, but have enough budget to become the owner of premium real estate.

Al Firdaus will become not only a resting place, but also a kind of cultural center. A separate building will house a multifunctional infrastructure: prayer rooms, halls for business events, a restaurant, a cinema, a library, separate recreation areas and a SPA.

The complex with breathtaking panoramic views is designed in the classical traditions of Islamic architecture. During the construction, ecological materials and modern technologies of the highest quality will be used.

The residence will be located on a plot of land with an area of 13800 m2, it will consist of seven 4-storey blocks and 104 luxury apartments of various layouts. The apartments will be equipped with air conditioning system, underfloor heating and household appliances. The penthouses will be equipped with saunas and indoor pools on terraces.

The exclusive infrastructure of the complex will include:

◆ Indoor pools with purified anolyte water (for the prevention of COVID-19 and other viruses)

◆ Indoor water parks

◆ Rest rooms

◆ Saunas

◆ Hamams

◆ Roman steam rooms

◆ Massage rooms and private massage rooms

◆ Fitness salons

◆ Playgrounds for children, kindergarden

◆ Restaurant

◆ Vitamin bar

◆ Cinema

◆ Library

◆ Rooms for meetings and business meetings

◆ Rooms for prayers

◆ Guest apartments

◆ Gardens with landscaping

◆ Transfer to the city and to the beach

◆ Parking

◆ Generator

◆ Enhanced security and video surveillance system

 

Characteristics of the apartments:

◆ Steel entrance doors

◆ PVC windows with double glazing

◆ Floors - tiles

◆ Walls - waterproof paint

◆ Kitchen with a full set of furniture, granite countertops and a set of household appliances (oven, stove, extractor hood, dishwasher, washing machine and refrigerator)

◆ Bathrooms with a full set of fixtures and fittings

◆ Heated floors

◆ Air conditioning system

◆ Primary and secondary lighting

◆ Balconies and terraces

◆ Wireless internet access

◆ Satellite television

 

Apartment types:

◆ 1 + 1 (57-64 m2) - 42 apartments

◆ 2 + 1 (80-99 m2) - 44 apartments

◆ 2 + 1 garden duplex (105 m2) - 2 apartments

◆ 3 + 1 penthouse with pool (209 - 215 m2) - 8 apartments

◆ 4 + 1 garden duplex (148 m2) - 2 apartments

◆ 4 + 1 penthouse with pool (290 - 320 m2) - 5 apartments

◆ 5 + 1 penthouse with pool (334 m2) - 1 apartments


Project Profile

Al Firdaus Kargıcak Residences - Brochure


A-Block Duplex Type-1 (4+1)


A-Block Duplex Type-2 (2+1)


A-Block Duplex Type-3 (5+1)


A-Block Type-1 (2+1)


A-Block Type-3 (1+1)


A-Block =Type-4 (1+1)


B&C-Block Duplex Type-1 (4+1)


B&C-Block Type-1 (2+1)


B&C-Block Type-2 (1+1)


D&G-Block Duplex Type-1 (3+1)


D&G-Block Type-1 (2+1)


D&G-Block Type-2 (1+1)


D&G-Block Type-3 (1+1)


E&F-Block Duplex Type-1 (3+1)


E&F-Block Type-3 (2+1)


E&F-Block Type-1 (2+1)


E&F-Block Type-2 (2+1)


General Spaces - Bodrum Floor Plan


General Spaces - Ground Floor Plan


Total Blocks


Project Features / Amenities

The exclusive infrastructure of the complex will include:

◆ Indoor pools with purified anolyte water (for the prevention of COVID-19 and other viruses)

◆ Indoor water parks

◆ Rest rooms

◆ Saunas

◆ Hamams

◆ Roman steam rooms

◆ Massage rooms and private massage rooms

◆ Fitness salons

◆ Playgrounds for children, kindergarden

◆ Restaurant

◆ Vitamin bar

◆ Cinema

◆ Library

◆ Rooms for meetings and business meetings

◆ Rooms for prayers

◆ Guest apartments

◆ Gardens with landscaping

◆ Transfer to the city and to the beach

◆ Parking

◆ Generator

◆ Enhanced security and video surveillance system

Price Starts from 245000 Price Ends On 1500000

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.