Euro Avsallar Residency

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Kurt Safir Construction & Development Company

Project Gallery

Euro Avsallar Residence

This is a great choice to make your dream come true


Euro Avsallar 

Euro Avsallar is a residential complex with extensive infrastructure, located in a picturesque area of ​​Alanya- Avsallar. Thanks to the successful choice of land, absolutely all apartments offer stunning views of the Mediterranean Sea, the city and the Taurus Mountains. Avsallar is an elite area, located just 20 minutes from the center of Alanya, between the Taurus mountain range and the Mediterranean Sea.

The residence will be located on a 4266 m2 plot of land, will consist of one 9-storey block, which will house 90 apartments of various layouts. The famous Incekum beach is only 850 m away. The entire developed infrastructure of the city - restaurants, markets, shopping malls, pharmacies, parks - is within walking distance.

Euro Residence Avsallar is the perfect choice for those who value a luxurious lifestyle and, at the same time, a private, delicate pastime.

If you dream of living on the shores of the Mediterranean Sea, this is a great choice to make your dream come true!

Complex infrastructure:

  • Outdoor pool
  • Heated outdoor pool
  • Aquapark
  • Reception
  • Loby     
  • Dressing rooms
  • Turkish hamam
  • Sauna
  • Roman steam room
  • SPA
  • Salt room
  • Massage rooms
  • Playing room
  • Kid’s playroom 
  • Meeting room
  • WC/ showers 
  • Gym
  • Cafe/Restaurant
  • Barbecue 
  • Gazebo
  • Sunbathing area
  • Parking lot
  • Generator
  • Satellite TV and İnternet
  • Security


Apartment features

  • Steel entrence door
  • Kitchen furniture
  • Floors coated with Ceramic Tiles 
  • Erasable plastic wall paint
  • PVC Balkon doors and Windows with double glazing
  • TV and Phone cable
  • Electric sockets in every room
  • Sliding balcony doors

Project Profile

Project Plans


1+1 Flat Plan


1+1 Type-2 Flat Plan


2+1 Flat Plan


2+1 Type-2 Duplex Flat Plan


2+1 Duplex Flat Plan


3+1 Duplex Flat Plan


Bodrum Floor General Places


Normal Floor Plan


Type-1


Type-2


Type-3


Project Features / Amenities

Complex infrastructure:

  • Outdoor pool
  • Heated outdoor pool
  • Aquapark
  • Reception
  • Loby     
  • Dressing rooms
  • Turkish hamam
  • Sauna
  • Roman steam room
  • SPA
  • Salt room
  • Massage rooms
  • Playing room
  • Kid’s playroom 
  • Meeting room
  • WC/ showers 
  • Gym
  • Cafe/Restaurant
  • Barbecue 
  • Gazebo
  • Sunbathing area
  • Parking lot
  • Generator
  • Satellite TV and İnternet
  • Security

 

Apartment features

  • Steel entrence door
  • Kitchen furniture
  • Floors coated with Ceramic Tiles 
  • Erasable plastic wall paint
  • PVC Balkon doors and Windows with double glazing
  • TV and Phone cable
  • Electric sockets in every room
  • Sliding balcony doors
Price Starts from 150000 Price Ends On 219000

Want to know the latest pricing?
Fill out the form

Duplex 2+1 (115m2)

Total: 18
Available: 2
I am Interested

Duplex 2+1 (106m2)

Total: 54
Available: 18
I am Interested

Duplex 3+1 (169m2)

Total: 18
Available: 2
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.