Euro Residence 16

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Kurt Safir Construction & Development Company

Project Gallery

Euro Residence 16


Good location: Euro Residence XVI is situated in Mahmutlar settlement on the distance of 500m from the sea. Path to the center of Alanya takes only 15 minutes. The settlement is famous for its historical landmarks, picturesque nature, developed town infrastructure and beautiful beaches.

Warm sea and sun all over the year, wonderful Mediterranean climate, good ecology, abundance of vegetables and fruits all over the year – you will get all of these with KURTSAFIR real estate.

LOCATION

  • Distance to the sea – 500 m
  • Distance to Alanya – 12 km
  • Distance to Gazipasha airport – 34 km

Complex consists of:

  • One 12-floor block situated on 2201 m2  land
  • 59 apartments: 33 apartments 1+1, 22 apartments 2+1, 4 penthouses
  • Outdoor swimming pool with kids’ zone
  • Sauna
  • Fitness center
  • Garden
  • Elevator
  • Generator 
  • Parking for cars

Apartments are equipped with:

  • Steel entrance door, room doors – high quality wooden panel
  • Built kitchen furniture with granite tabletop
  • In bathrooms full sanitary equipment, built furniture and wall mirror
  • Floors covered with ceramic tile
  • Wall covered with washable teflon paint 
  • High quality PVC double-layer insulated glass
  • Mosquito nets and blinds
  • Panoramic balcony in the living room
  • TV and telephone cables
  • General and spot lightening
  • According to your wishes we can equip your apartment with SIEMENS technical goods

Project Profile

Euro16 Brochure


Euro-16 Residence


Basement-Floor


Normal-Floor-1


Normal-Floor-2


Penthouse-Plan-1


Penthouse-Plan-2


Penthouse-Center-3+1


Penthouse-Corner-3+1


Plan-1+1


Plan-2+1


Project Features / Amenities

Complex consists of:

  • One 12-floor block situated on 2201 m2  land
  • 59 apartments: 33 apartments 1+1, 22 apartments 2+1, 4 penthouses
  • Outdoor swimming pool with kids’ zone
  • Sauna
  • Fitness center
  • Garden
  • Elevator
  • Generator 
  • Parking for cars

Apartments are equipped with:

  • Steel entrance door, room doors – high quality wooden panel
  • Built kitchen furniture with granite tabletop
  • In bathrooms full sanitary equipment, built furniture and wall mirror
  • Floors covered with ceramic tile
  • Wall covered with washable teflon paint 
  • High quality PVC double-layer insulated glass
  • Mosquito nets and blinds
  • Panoramic balcony in the living room
  • TV and telephone cables
  • General and spot lightening
  • According to your wishes we can equip your apartment with SIEMENS technical goods
Price Starts from 0 Price Ends On 0

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.