Granada Resıdence Apartments

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Kurt Safir Construction & Development Company

Project Gallery

Granada Resıdence Apartments


Granada Resıdence Apartments (Standart and 2-store apartments)

In «Granada Residense» complex there are 12 buildings (blocks), which include:

  • 37 apartments 4+1 (dublex, penthouse) with area from 190 to 250 sq.m
  • 49 apartments 3+1 (standart, dublex, penthouse) with area from 140 to 245 sq.m
  • 46 apartments 2+1 with area from 93 to 120 sq.m
  • 16 apartments 1+1 with area from 57 to 63 sq.m

All internal infrastructure is created specifically and exclusively for home owners and their guests. The Security Service works twenty-four-hour.

Infrastructure Of Buildings:

  • Elevator
  • Parking for cars and bikes
  • Generator
  • Garden

Improvement Of The Apartments:

  • Steel front door
  • Built-in kitchen furniture with granite countertop
  • In the bathroom built-in furniture and bathroom equipment
  • Floor covering – ceramic
  • The walls are covered with washable Teflon paint
  • Plastic windows
  • Sliding balcony doors with aluminium frame
  • Shutters on the windows
  • Intercom
  •  Electrical outlets in all rooms and balconies
  • TV and telephone cables

All materials used in construction, are certified and meet European quality standards.

Prices for purchased property are set at the time of the signing of a sale contract.


Project Profile

Granada Resıdence Apartment - Project Profile


Granada Resıdence Apartment - Catalogue


Granada Resıdence Apartment - Brochre


a blocks Duplex basement high


A block Duplex first floor high


A block Normal first floor high


A block penthouse first floor high


A blocks penthouse upstairs high


B blocks duplex basement floor


B blocks duplex first floor


B blocks Normal floor


B blocks penthouse first floor


B blocks penthouse upstairs


C Block Duplex Basement Floor


C Block Duplex First Floor


C Block Normal Floor


C Blocks Penthouse First Floor


C Blocks Penthouse Upstairs


Granada Residence Plans


Project Features / Amenities

Infrastructure Of Buildings:

  • Elevator
  • Parking for cars and bikes
  • Generator
  • Garden

Improvement Of The Apartments:

  • Steel front door
  • Built-in kitchen furniture with granite countertop
  • In the bathroom built-in furniture and bathroom equipment
  • Floor covering – ceramic
  • The walls are covered with washable Teflon paint
  • Plastic windows
  • Sliding balcony doors with aluminium frame
  • Shutters on the windows
  • Intercom
  •  Electrical outlets in all rooms and balconies
  • TV and telephone cables
Price Starts from Price Ends On

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.