Granada VIP Villas

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Kurt Safir Construction & Development Company

Project Gallery

Granada VIP Villas


Granada VIP Villas

Modern villa complex situated on total area 7910 m ² with memorable panoramic views to the sea and mountains, executed for comfortable rest by an authentic home decoration and equipped up to the state of the art. 

The total area of an individual villa with a garden is 500 m ² includes 4 bedrooms, 1 living room (salon with kitchen), and 4 bathrooms (one of them with a jacuzzi), on the first floor individual pool and indoor garage, on the second floor sauna is located.

The spacious living room occupies practically all first floor and consists of kitchen equipped with all necessary household appliances, a lunch zone opposite to windows with panoramic views. On the first floor there is a spacious guest bedroom with a bathroom and panoramic windows from the floor up to the ceiling with an exit to the garden.

Panoramic doors exit to 30 m² pool with a terrace and sunbeds. Stylish lounges near the pool are perfect for daily lunch and also for romantic dinner where you can take your place, drinking cocktail, breathing fresh sea and Taurus Mountains’ air. 

Other 3 bedrooms are situated on the second floor. Magnificent main bedroom with an impressive bathroom and wardrobe. All bedrooms on the second floor have panoramic windows from the floor up to the ceiling and a terrace balcony.

Each Villas has:

  • Individual garage
  • Individual pool - 30 м²
  • Sauna
  • Garden
  • 4 bedrooms
  • guest bedroom, 1 floor - 14,5 м²
  • main bedroom, 2 floor - 24,4 м²
  • bedroom, 2 floor - 16,5 м²
  • bedroom, 2 floor - 15,2 м²
  • 4 bathrooms (one with a Jacuzzi)

VILLA’S features:

  • Steel front door 
  • Built-in kitchen furniture with granite countertop  
  • In the bathroom built-in furniture and bathroom equipment
  • Floor covering – ceramic and granite
  • In the bathrooms and saloon « floor heating » system
  • Wall covering - wallpaper
  • Plastic windows 
  • Sliding balcony doors with aluminum frame
  • Shutters (on the windows of the ground floor)
  • Illumination in the garden
  • Electrical sockets in all rooms and balconies
  • TV and telephone cables 
  • Electrical Water Heater
  • Garden is equipped with irrigation system 
  • The pool is equipped with an automatic system of water treatment

Service:

  • garden and pool cleaning 
  • satellite TV 
  • Wi-Fi Internet
  • 24 hour security

Project Profile

Granada VIP Villas-Brochure


Granada VIP Villas-Profile


Granada VIP Villas First-Floor-Plan-1


Granada VIP Villas First-Floor-Plan-2


Granada VIP Villas First-Floor-Plan-3


Granada VIP Villas Upstairs-1


Granada VIP Villas Upstairs-2


Project Features / Amenities

Each Villas has:

  • Individual garage
  • Individual pool - 30 м²
  • Sauna
  • Garden
  • 4 bedrooms
  • guest bedroom, 1 floor - 14,5 м²
  • main bedroom, 2 floor - 24,4 м²
  • bedroom, 2 floor - 16,5 м²
  • bedroom, 2 floor - 15,2 м²
  • 4 bathrooms (one with a Jacuzzi)

VILLA’S features:

  • Steel front door 
  • Built-in kitchen furniture with granite countertop  
  • In the bathroom built-in furniture and bathroom equipment
  • Floor covering – ceramic and granite
  • In the bathrooms and saloon « floor heating » system
  • Wall covering - wallpaper
  • Plastic windows 
  • Sliding balcony doors with aluminum frame
  • Shutters (on the windows of the ground floor)
  • Illumination in the garden
  • Electrical sockets in all rooms and balconies
  • TV and telephone cables 
  • Electrical Water Heater
  • Garden is equipped with irrigation system 
  • The pool is equipped with an automatic system of water treatment

Service:

  • garden and pool cleaning 
  • satellite TV 
  • Wi-Fi Internet
  • 24 hour security
Price Starts from Price Ends On

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.