Albimo AHM Loft

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Albimo AHM Construction

Project Gallery

Albimo AHM Loft


ALBIMO AHM LOFT - In Mahmutlar, one of the attraction centers of Alanya, only two minutes' walk from the center, our project, which has all the social opportunities of the city, attracts attention with its different design and architectural structure. Albimo Ahm Loft, our project that we brought together with you at the end of a long working process; It will bring your comfort level and living standards to the highest level with its wide social facilities.

our project consisting of blocks Albimo Ahm Loft; in your name It takes from the spacious and large Loft apartments it has. Albimo Ahm Loft is an AHM Project design. Our Albimo Ahm Loft project is carried out by Albimo-AHM Construction. Albimo Ahm Loft is only 650 m from the sea and is intertwined with the city and nature. The main social areas and features of our project are listed below.

SOCIAL AREAS

  • Outdoor swimming pool
  • Cinema
  • Aquapark
  • Billiards
  • Heated indoor swimming pool
  • Ping pong
  • Turkish bath
  • Lobby
  • Steam room
  • Snack bar
  • Sauna
  • Poolside Mini bar
  • Salt room
  • WIFI in the social area
  • Massage rooms
  • Security camera
  • Resting room
  • Open
  • Parking Garage
  • Camellia
  • Poolside Mini bar
  • Outdoor-Indoor children's playground
  • Security
  • Gym
  • International TV broadcast
  • Generator
  • Basketball court
  • Tennis court

PROJECT DETAILS

  • 48 units 1+1 GROSS 75 m²
  • 48 units of 1+1 GROSS 63 m²
  • 48 units of 1+1 GROSS 57 m²
  • 48 units 1+1 GROSS 56 m²
  • 12 units of 1+1 GROSS 64 m²
  • 6 LOFT 1+1 GROSS 124 m²
  • 4 2+1 DUPLEX GROSS 148 m²
  • 4 2+1 DUPLEX GROSS 132 m²
  • 4 2+1 DUPLEX GROSS 126 m² (EXTRA CLOTHING ROOM AVAILABLE)
  • 4 2+1 DUPLEX GROSS 122 m²
  • 2 2+1 DUPLEX GROSS 128 m²

Albımo AHM Loft sample payment plan after contract, 30% pre-paıd wıll be made. The remaınıng amount of 70% wıll be paıd ın ınstallments of 2 – 3 – 4 months wıth zero ınterest.

Construction Start Date OCTOBER 2020

Construction Completion MAY 2022


Project Profile

Project-Information


Duplex First Floor Plan Block-A


Duplex First Floor Plan Block-B


Duplex Roof Floor Plan Block-A


Duplex Roof Floor Plan Block-B


Plan Type-1 Bloack A


Plan Type-1 Bloack B


Plan Type-3 Bloack A


Plan Type-3 Bloack B


Plan Type-4 Bloack A


Plan Type-4 Bloack B


Social Area-1 Block A


Social Area-1 Block B


Social Area-2 Block B


Project Features / Amenities

  • Outdoor swimming pool
  • Cinema
  • Aquapark
  • Billiards
  • Heated indoor swimming pool
  • Ping pong
  • Turkish bath
  • Lobby
  • Steam room
  • Snack bar
  • Sauna
  • Poolside Mini bar
  • Salt room
  • WIFI in the social area
  • Massage rooms
  • Security camera
  • Resting room
  • Open
  • Parking Garage
  • Camellia
  • Poolside Mini bar
  • Outdoor-Indoor children's playground
  • Security
  • Gym
  • International TV broadcast
  • Generator
  • Basketball court
  • Tennis court
Price Starts from Price Ends On

Want to know the latest pricing?
Fill out the form

2+1 Duplex A Block-11-Floor

Total: 9
Available: 1
I am Interested

1+1 Duplex A Block-9-10-Floor

Total: 17
Available: 1
I am Interested

1+1 A Block-5-6-Floor

Total: 17
Available: 1
I am Interested

2+1 Duplex B Block-11-Floor

Total: 9
Available: 2
I am Interested

1+1 B Block-5-6-Floor

Total: 17
Available: 1
I am Interested

1+1 B Block-1-2-Floor

Total: 17
Available: 1
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.