Babacan Central

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Babacan Yapi

Project Gallery

Babacan Central


One of the Most Prestigious Projects of Istanbul is in Beylikdüzü:

Babacan Holding is one step closer to adding value to your urban life and offering the greatest investment of your future with Babacan Central Project. Babacan Central is in Beylikdüzü, right along the E-5 highway, and the Project overcomes the most pressing issue of Istanbul, i.e. Traffic, with a number of easy transportation options available and the Project has designed a life that is away from the hustle of the city but yet right at the heart of the city. Inspired by the urban life, the project combines busy city life with comfort and coziness as well as offering a luxuries and chic living space.

Babacan Central, consisting of three blocks and street shops has been specially designed for you as home-office.
You will spend your time pleasure in the concept streets, gourmet street and brands street we created with Street Shops, you will shop from the brands you desire and enjoy different tastes.

You will desire to live in Babacan Central, the newest and most urban project of İstanbul, equipping luxury and comfort with its social areas.

Babacan Central is being built on the E-5, at the center of all transportation axes.
Babacan Central, which is within walking distance of the Metrobus and metro stops of the Tem Connection road,
offers a real luxury for office workers and those who prefer public transportation.

If you are looking for a safe investment , residential, and commercial project., Babacan Central is your choice, where you will have a resell guarantee after 3 years with 20% profit. (Special for Baytii Clients)

Babacan Central Project specifications:

  • The project has 3 blocks
  • The number of floors is 30 – 33 – 37 respectively.
  • 969 apartments in total and 120 commercial shops
  • Types of apartments: 1+1, 2+1, and 3+1
  • The design of the Babacan Central project is unique and modern, and the finishing will be with a high degree of elegance and beauty.
  • Babacan Central project is characterized by a unique and flexible payment plan, there is a possibility of installment for 40 months with a down payment of 35%

Project Profile

project brochure


1+0 plan


1+0-A-2-Block


1+0-B-Block


1+1-A-1-Block


1+1-A-2-Block


1+1-B-Block


2+1-A-2-BlockB2


2+1-B-Block


Project Features / Amenities

 

  • Large size windows are designed for each flat, overlooking the city’s lights and captivating landscapes
  • Babacan Central offers its residents, unique recreational areas, such as swimming pools, fitness centers, Parking lots, and other social facilities   
  • The residential units include fully equipped kitchen areas of international brands, fine marble origins, and stylish bathrooms
  • Top-quality materials and finishes are used in this project such as high-security steel entrance doors, Double-glazed windows, heavy-duty air conditioning, and security systems.

Social Facilities

  • 24/7 Security
  • Parking
  • Central cooling
  • Central Heating
  • Sauna
  • Steam room
  • Turkish bath
  • Swimming pool
  • Football field
  • Basketball court
  • Tennis court
  • Children playground
  • Green Areas
Price Starts from 181539 Price Ends On 259483

Want to know the latest pricing?
Fill out the form

1+0 Apartments

Total: 105
Available: 28
I am Interested

1+1 Apartments

Total: 135
Available: 40
I am Interested

2+1 Apartments

Total: 93
Available: 12
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.