Botanic Garden

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Kyt Yapi

Project Gallery

Botanic Garden


Built with high standards, it offers luxury to all of its new homeowners. Let us not forget to mention just minutes away, you can access all the markets, restaurants, and other amenities nearby.

As the Project name describes it, we aim to create a haven for plant life with an abundance of flowers, trees, plants, and grass. Here, you and your family can enjoy a wonderful luxurious life while being a part of nature.
 
Our Project Botanic Garden's location is a great advantage for investors as it is between Mahmutlar and Alanya's borders. Also, the beach is short walking distance to the project and just far enough from the road away from the noise.
 
Botanic Garden will consist of seven 5-story residential blocks, 178 apartments with different layouts. The properties are modern in design and luxurious style with one, two, and three-bedroom apartments. These new apartments are ideal as an investment if you are looking for a property close to the beach.
 
All apartments are fitted with high-quality materials around the floors, walls, and rooms, such as the kitchen and bathroom. Botanic Garden is an excellent investment in luxury real estate, located in an area of 12,000 m². The social areas will be decorated with lots of plant life.
 


Project Profile

Project Profile


A-B Block 3 Floor Duplex


A-B Block Loft Floor


A-B Block Floor 1-2 Floor Plan


A-B Block Loft Plan


A-B Block Ground Floor Plan


A-B Block 1.2 Floor Plan


A-B Block 3.Kat Duplex Plan


C-D-E Block Floor Floor Plan


C-D-E Block Roof Plan


C-D-E Block Basement Floor Plan


C-D-E Block 3 Floor Duplex


C-D-E Block 1-2 Floor Plan


Project Features / Amenities

  •  Wi-Fi around the pool and social areas
  •  Camera system
  •  Backup generator
  •  Lounge with pool tables
  •  Cinema room
  •  Gym
  •  Sauna
  •  Spa
  •  Big outdoor swimming pool
  •  Elevator
  •  Showers near the swimming pool
  •  Indoor swimming pool
  •  Security guards
  •  Barbeque area
  •  Turkish bath
  •  Cable TV - Satellite
  •  Open Car Park
  •  Indoor Car park
Price Starts from 115500 Price Ends On 255000

Want to know the latest pricing?
Fill out the form

1+1 apartment

Total: 35
Available: 15
I am Interested

2+1 apartment

Total: 26
Available: 4
I am Interested

2+1 Duplex apartment

Total: 22
Available: 8
I am Interested

3+1 Duplex apartment

Total: 2
Available: 1
I am Interested

4+1 Duplex apartment

Total: 4
Available: 2
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.