Brooklyn Suite Alanya Centrum

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Memos Home

Project Gallery

outdoor


Memoshome Construction’s brand-new project, slated to be completed by December,2023, redefines urban living in the town of never-ending summers. Tucked in the very centre of Alanya’s blooming shopping hub and surrounded with top quality boutiques, restaurants and cafes Brooklyn Suite places you in the heart of town where everything you need is at the tip of your fingers.

A project of unmatched quality weaves together a life of convenience, comfort and cosy opulence. From its gleaming architectural design to stunning finishes awaiting at every corner, Brooklyn Suite stands apart with its premium quality offering you the ultimate city life. Sleek interiors made convenient with masterful details and the gleaming waters of a private pool, etch the excellence of city living into every moment of bliss.

A step out the door puts you right in the centre of Alanya’s hottest boulevard of boutiques and cafes while public transport awaits your next adventure at the corner. As the Mediterranean sparkles a few hundred meters away, inviting you to indulge in its long, golden summers, the evenings glow with the tempo of a town that never sleeps. In its midst, Brooklyn Suite becomes a haven of comfort and peace.

With 20 one-bedroom apartments in varying sizes and layouts across five levels, as well six shops available for lease, Brooklyn Suite presents you with a bespoke life, designed and finished to meet your every need. The city’s finest restaurants, world renowned boutiques and cosiest cafes circle the block, opening the doors to a hedonistic life of  lavish tastes and upscale comforts. Spas, wellness and fitness centres, clinics, and parks  scattered throughout the neighbourhood ensure that your every wish is met while the warm sandy beaches of the Mediterranean stretch along the shore, within walking distance.
Dwell in the urban in matchless luxury, where Brooklyn Suite sets the standard of
transcendent city living.
---
Distance
To the beach: 400 m
Shopping: 0 m
Antalya Airport: 130 km
Gazipaşa Airport: 40 km


Project Profile

Project Information


ground-floor


normal-plan


outdoor-area-plan


Project Features / Amenities

Private pool

Clinics

fitness centres

clinics

Price Starts from 310000 Price Ends On 360000

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.