Diamond Loft

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Albimo AHM Construction

Project Gallery

Diamond Loft - Albimo AHM Construction


Diamond Loft - Avsallar, one of the attraction centers of Alanya, is only two kilometers away from the center.
Our project, which has all the social opportunities of the city, within walking distance of a minute, attracts attention with its different design and architectural structure. Our project, Diamond Loft, which we brought together with you at the end of a long working process; It will carry your comfort level and living standards to the highest level with its wide social facilities. Diamond Loft, our project consisting of 2 separate blocks in an area of ​​7568 m²; It takes its name from the spacious and wide Loft apartments it contains. Diamond Loft is an AHM Project
is design. Our Diamond Loft project by Albimo-AHM Construction
is done.

Diamond Loft is only 800 m away from the sea and is intertwined with the city and nature. The main social areas and features of our project are listed below.

Social Areas

  • Outdoor swimming pool
  • Aquapark
  • Heated indoor swimming pool
  • Turkish bath
  • Steam room
  • Sauna
  • Salt room
  • Massage rooms
  • Resting room
  • Camellia
  • Outdoor-Indoor children's playground
  • Gym
  • Generator
  • Tennis court
  • Cinema
  • Billiards
  • Ping pong
  • Lobby
  • Snack bar
  • Poolside Mini bar
  • WIFI in the social area
  • Security camera
  • Outdoor Parking
  • Poolside Mini bar
  • Security
  • International TV broadcast
  • Basketball court

Project Profile

Project Brochure


1st floor Plan


2nd Floor Plan


3rd Floor Plan


4th Floor Plan


5th Floor Plan


6th Floor Plan


7th Floor Plan


8th Floor Plan


Social-Space-Plan


Project Features / Amenities

  • Outdoor swimming pool
  • Aquapark
  • Heated indoor swimming pool
  • Turkish bath
  • Steam room
  • Sauna
  • Salt room
  • Massage rooms
  • Resting room
  • Camellia
  • Outdoor-Indoor children's playground
  • Gym
  • Generator
  • Tennis court
  • Cinema
  • Billiards
  • Ping pong
  • Lobby
  • Snack bar
  • Poolside Mini bar
  • WIFI in the social area
  • Security camera
  • Outdoor Parking
  • Poolside Mini bar
  • Security
  • International TV broadcast
  • Basketball court
Price Starts from 175500 Price Ends On 170000

Want to know the latest pricing?
Fill out the form

Ground Floor 4+1 Duplex-Apartments

Total: 2
Available: 2
I am Interested

Ground Floor 2+1 Duplex-Apartments

Total: 1
Available: 1
I am Interested

Loft Apartment on 1 and 2 floor

Total: 1
Available: 1
I am Interested

2+1 Apartment for sale on Floor-3

Total: 2
Available: 1
I am Interested

Loft Apartment on 5 and 6 floor

Total: 1
Available: 1
I am Interested

3+1 Duplex-Apartments on Floor 8

Total: 2
Available: 2
I am Interested

2+1 Duplex-Apartments on Floor 8

Total: 7
Available: 7
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.