Eksen Life

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Tokus Insaat

Project Gallery

Eksen Life


Alanya is one of the most beautiful districts of Antalya, which is very beautiful and has beaches, cafes, bars and comfortable ones. Specifically the main production of magic castle and mountain scenery. Evening lighting romantic atmosphere and a touch of mystical touch. The scenery is so good that only a few kilometers from the sea can reach the mountains. All of the beaches in Alanya are in good condition with sand and clean sea. Alanya city center is close to each other. Walking is pretty much his sequence. Our project is located in Oba Neighborhood, which is the life center of Alanya.
Eksen Life project land belongs to our facility and will be built with a modern architectural structure and luxury apartment design. offers you a new life.

Eksen Life project is built on a land of 1,450 m2. Eksen Life Flat Types;

  • 24 Apartments
  • 8 units of 1+1 (50 m2)
  • 3 units of 2+1 (75 m2)
  • 3 2+1 Duplex (152 m2)
  • 1 concierge
  • outdoor swimming pool
  • fitness
  • jacuzzi
  • sauna
  • lobby
  • cafeteria
  • open parking lot
  • camera system
  • garden lighting
  • video intercom are available.

Location Features:

  • 550m to the new state hospital
  • Ted Alanya College 250m
  • 650m to Koçtaş Mall
  • Distance to the sea 1.300m
  • 950m to Metro Mall

Project Profile

Project Brochure


1-floor plan


2-floor plan


3-floor plan


basement floor plan


Ground floor plan


Roof Floor Plan


Project Features / Amenities

  • 1 concierge
  • outdoor swimming pool
  • fitness
  • jacuzzi
  • sauna
  • lobby
  • cafeteria
  • open parking lot
  • camera system
  • garden lighting
  • video intercom are available.

Location Features:

  • 550m to the new state hospital
  • Ted Alanya College 250m
  • 650m to Koçtaş Mall
  • Distance to the sea 1.300m
  • 950m to Metro Mall
Price Starts from 92500 Price Ends On 186250

Want to know the latest pricing?
Fill out the form

1+1 Apartments

Total: 18
Available: 10
I am Interested

2+1 Apartments

Total: 3
Available: 3
I am Interested

3+1 Duplex Apartments

Total: 3
Available: 3
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.