Emerald Grand Deluxe

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Toroslar Construction

Project Gallery

Emerald Grand Deluxe


Emerald Grand Deluxe is being built in Avsallar, one of the fastest developing areas in Antalya, the perfect place for investment in your future. It is situated between Antalya and Alanya, with easy access to 2 international airports. The Antalya International airport is 103 km away and the smaller Alanya Gazipasa International Airport is 64 km away.  The busy Alanya city centre is 23 km from our amazing project. 

Avsallar is also home to one of the most famous beaches in Turkey, Incekum beach, which is 800 metres from Emerald Grand Deluxe. We will also have a free shuttle service to and from the beach for our residents. 

The Avsallar town centre is 700 metres away, and offers a wide selection of shopping facilities, restaurants, cafes and more. The largest weekly market in the area, where you will find locally grown organic fruits and vegetables, as well as lots of homemade produce is set up each Wednesday just 300 metres from Emerald Grand Deluxe

Emerald Grand Deluxe will be built on a 19,212 m2 plot and consists of 6 nine storey blocks. There will be a total of 378 apartments, 222 1-bedroom apartments, 88 2-bedroom apartments 42 penthouse apartments and for the first time in an Emerald project there will also be 26 garden duplex apartments, which each have a private garden, ranging in size from 51 m2 to 100 m2.  Ensuring everyone can be a proud owner of an Emerald apartment with the high quality and comforts of Toroslar Emerald.  Each apartment will come with fully fitted kitchens and bathrooms, air conditioning in each room and an instant water heater included. 

When designing our latest project, we aimed to provide a each of our clients with a home where they can get away from the stress of daily life and enjoy themselves. To enable this, we have included all the amenities of a 5-star hotel. These include large outdoor swimming pool with water slides (526 m2), a separate children’s swimming pool (41 m2), a relaxation swimming pool for adults (137 m2) and a heated indoor swimming pool (59 m2) as part of the luxury Spa centre. The Spa centre also has a Turkish bath, a sauna, a steam room, and massage rooms. Other amenities include a large professionally equipped gym, a kids club for our smaller residents, a cinema, and a games and entertainment room. We will also have a beautiful restaurant on-site. Outdoor amenities include large gardens, with a barbeque area, a great play park for children, and tennis and basketball courts.  There will also be on-site parking as well as a parking garage.

Everything has been planned and designed taking into consideration the needs and comforts of our residents, down to the smallest of details. The same care and attention will be shown during the construction of our project. Don’t miss out on this opportunity to invest in your family’s future. Giving you and your family the chance to enjoy a peaceful and comfortable in the sun. 

TECHNICAL DETAILS

LEISURE FACILITIES
• Swimming pool & Children's pool 
• Children's playground 
• Waterslides (Aqua park)
• Turkish Bath
• Massage Room
• Sauna
• Fitness centre
• Heated indoor swimming pool
• Steam room
• Tennis Court
• Billiards and Table Tennis
• Kids Club
• Play Station Game and TV Screen
• Power Generator
• BBQ Areas with Pergolas
• Wireless Internet in Commonunal Areas
• Restaurant
• General Storage
• Cinema

KITCHEN
• Custom designed modular kitchen furniture
• Granite worktop
• Ceramic floor tiles

BATHROOM
• Bordered ceramic floor and wall tiles 
• Shower cabin PARKING
• Car parking spaces
• Indoor Car Park
• On-site Car Park


SECURITY & SAFETY
• Audio-visual Door Phone
• Separate flat for caretaker
• 24/7 Security in the complex
• Gardeners and Caretakers


GENERAL
• Central TV-Satellite 
• Lifts 
• Pressurized water
• PVC Double Glazed Windows 
• Built-in Spot Lights in Living Rooms and Kitchens
• Solid steel entrance door
• Heat Resistant walls
• Recessed Spot lights 
• Feature coving and skirting
• Ceramic tile flooring in all rooms
• Each Room Includes air conditioner

BALCONY
• Well-proportioned balconies with Aluminium and glass handrails or wrought iron handrails 
• Ceramic flooring and external lighting


Project Profile

project brochure


Lay out plan


a-c-e-block-normal-floor


B-D -F block-normal-floor


a-block-basement--floor


a-block-duplex-floor


a-block-roof-floor


b-block-basement--floor


b-block-duplex-floor


b block roof floor


c block garden duplex


c block duplex floor plan


c block garden duplex first floor


c block roof floor plan


d block garden duplex ground floor


d block duplex floor


d block garden duplex first floor


d block roof floor


e block garden duplex ground floor


e block duplex floor


e block garden duplex first floor


e block roof floor


f block garden duplex ground floor


f block duplex floor


f block garden duplex first floor


f block roof floor


Project Features / Amenities

TECHNICAL DETAILS

LEISURE FACILITIES
• Swimming pool & Children's pool 
• Children's playground 
• Waterslides (Aqua park)
• Turkish Bath
• Massage Room
• Sauna
• Fitness centre
• Heated indoor swimming pool
• Steam room
• Tennis Court
• Billiards and Table Tennis
• Kids Club
• Play Station Game and TV Screen
• Power Generator
• BBQ Areas with Pergolas
• Wireless Internet in Commonunal Areas
• Restaurant
• General Storage
• Cinema

KITCHEN
• Custom designed modular kitchen furniture
• Granite worktop
• Ceramic floor tiles

BATHROOM
• Bordered ceramic floor and wall tiles 
• Shower cabin PARKING
• Car parking spaces
• Indoor Car Park
• On-site Car Park


SECURITY & SAFETY
• Audio-visual Door Phone
• Separate flat for caretaker
• 24/7 Security in the complex
• Gardeners and Caretakers


GENERAL
• Central TV-Satellite 
• Lifts 
• Pressurized water
• PVC Double Glazed Windows 
• Built-in Spot Lights in Living Rooms and Kitchens
• Solid steel entrance door
• Heat Resistant walls
• Recessed Spot lights 
• Feature coving and skirting
• Ceramic tile flooring in all rooms
• Each Room Includes air conditioner

BALCONY
• Well-proportioned balconies with Aluminium and glass handrails or wrought iron handrails 
• Ceramic flooring and external lighting
 

Price Starts from 130000 Price Ends On 214000

Want to know the latest pricing?
Fill out the form

1+1 aprtment

Total: 240
Available: 65
I am Interested

2+1 aprtment

Total: 96
Available: 26
I am Interested

2+1 duplex

Total: 30
Available: 19
I am Interested

3+1 duplex

Total: 12
Available: 6
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.