Erel Life Mahmutlar

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Erel Constructıon

Project Gallery

EREL LİFE MAHMUTLAR


Erel Construction Company is a responsible and reliable construction company with extensive experience in residential and
commercial real estate in Alanya. Our project will be build on the Barbaros Street in Mahmutlar and located on the second line to the sea.
It’s approximately 150 meters distance to the sea. Our project, consisting of 4 blocks in total, will be 2 separate housing complex named
Erel Life 1 and Erel Life 2. Each housing complex will have its own social activities. Our project, will consist of 2 + 1 and 3 + 1 Dublex penthouse apartments with Sea View, Project will be with full social activity.The project starting date planned as 10.2021 and will be delivered in 18 months.

Mahmutlar has a fantastic location 10 km east of Alanya, with the majestic Taurus mountains as a backdrop and the beautiful Mediterranean in the front. Mahmutlar stretches about 5 km, from Kestel to the west to Kargicak to the east, and is one of Alanyas largest suburbs, Mahmutlar is constantly developing, and you can find everything you need for a comfortable life; a large selection of restaurants, cafes and bars, shopping, banks, pharmacies and hairdressers.

For your weekly grocery shopping you can go to one of the larger supermarkets, or visit the bazaar which is held two times a week, and buy your fresh fruits and vegetables, cheese, nuts, olives, egg, milk, butter and spices directly from the farmers.

Mahmutlar is surrounded by many farms and banana plantations, giving a wonderful green view, and the beach is clean and beautiful with clear blue water – perfect for your morning swim.

projects features are;

• Satellite TV
• LED lights
• American style kitchen
• Balcony
• Roof terrace
• Ensuite Bathroom
• PVC windows
• Double Glazing
• Shower
• Shower kabin
• Kitchen Cupboards
• Steel Entrance door
• Visual intercom system
Common facilities
• Pergola
• Lobby
• Garden
• Communal pool
• Turkish Bath
• Steam room
 


Project Profile

project brochure


A-block(normal-floor)


A-block-(upper-duplex-floor)


floor planA-block-(lower-duplex-floor)


B-block(normal-floor)


B-block-(upper-duplex-floor)


B-block-(lower-duplex-floor)


Project Features / Amenities

• Satellite TV
• LED lights
• American style kitchen
• Balcony
• Roof terrace
• Ensuite Bathroom
• PVC windows
• Double Glazing
• Shower
• Shower kabin
• Kitchen Cupboards
• Steel Entrance door
• Visual intercom system
Common facilities;
• Pergola
• Lobby
• Garden
• Communal pool
• Turkish Bath
• Steam room
 

Price Starts from 286000 Price Ends On 520500

Want to know the latest pricing?
Fill out the form

2+1 duplex

Total: 225
Available: 75
I am Interested

3+1 duplex

Total: 2
Available: 2
I am Interested

4+1 duplex

Total: 19
Available: 19
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.