EXODUS Garden Residence

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Exodus

Project Gallery

EXODUS Garden Residence


Exodus Garden Residence Will Be Located In The Avsallar District Of Alanya And Close To Incekum Forest Park And Its Delightful Beach, Without Doubt, One Of The Best In All Of Alanya.

The Project Will Comprise 2 Blocks Of 8 Floors And A Total Of 86 Apartments:

  • 1+1 – 50 M2.
  • 2+1 Duplex Penthouse – 110 M2.


There Will Be An Extensive Choice Of On-Site Facilities And Amenities – These Include Outdoor Swimming Pool, Heated Indoor Pool, Turkish Bath, Sauna, Steam Room, Relaxation Room, Fitness Suite, Restaurant, Cafe-Bar, Children’s Playground, Games Room And BBQ Area.

There Will Be Plenty Of Sun Loungers And Parasols Available On The Sun-Bathing Terrace That Surrounds The Outdoor Pool. There Will Also Be A Full-Time Caretaker, CCTV, On-Site Parking And Free Wi-Fi In The Social Areas. The Beach, Approximately 1400 Metres South, Will Be Served By A Regular Shuttle Bus.

Construction Will Commence In February 2021 With Completion Scheduled For May 2022.

We Can Offer An Interest Free Payment Plan For This Project With Payments Made In Equal Instalments (Either Monthly Or Quarterly) Over The Duration Of The Construction Period.


Project Profile

Project Details


Block A Infrastructure


Block A Normal


Block A Placement


Block B Infrastructure


Block B Normal


Block B Placement


Project Features / Amenities

  • Air Conditioner
  • American Kitchen
  • Available For Bank Credit
  • Balcony
  • Barbeque
  • Cable TV
  • Caretaker
  • Ceramic Floor
  • Double Glazed Windows
  • Earthquake Proof
  • Elevator
  • Fire Alarm
  • Fitness Center
  • Garden
  • Handicapped
  • Hot Water
  • In Complex
  • Indoor Swimming Pool
  • Internet
  • Laminated Floor
  • Marble Floors
  • Nature Sight
  • Parking Lot (car park)
  • Playpen
  • PVC Framed Windows
  • Residence
  • Satellite Line
  • Sauna
  • Security Camera
  • Security Officer
  • Shower Cabinet
  • Steel Front Door
  • Swimming Pool
  • Turkish Bath
  • Wi-fi
Price Starts from 69000 Price Ends On 70000

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.