EXODUS Nature Residence

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Exodus

Project Gallery

exodus nature residence


 

Apartment Types:

1 + 1, ranging in size from 47.5 m2 – 49 m2.

2 + 1 – 65 m2.

2+1 duplex penthouses, ranging in size from 103 m2 – 113 m2.

3+1 duplex penthouses – 142 m2.

At this early stage of construction, it is possible to combine 2 or more adjacent apartments into one single unit, should this satisfy your individual needs and requirements.

The social facilities of Exodus Nature Residence are extensive and will include: Outdoor swimming pool with pool bar, heated indoor pool, a steam room, a Turkish bath (Hammam), massage rooms, a fitness suite, a SPA area, a cinema, a cafeteria and mini-bar, children’s playroom, outdoor playground and a karaoke room.

In addition, there will be an electric generator, free Wi-Fi available throughout the social areas, video surveillance system, resident caretaker services and a daily shuttle service to the beach which will operate several times a day.

Exodus Nature Residence is located 4,000 metres from the beach, 3,000 metres from Alanya centre and 30 km from Alanya- Gazipasa International Airport.

Specially discounted apartment ‘early-stage construction’ prices:

1+1 – from 43.000 €

2+1 – from 59.000 €

2+1 Duplex Penthouses – from 65.000 €

3+1 Duplex Penthouses – from 99.000 €

Within the framework of the project, we offer an interest free payment plan, with payments made in equal instalments over the duration of the construction period. If necessary, we can also arrange a mortgage loan with a Turkish bank, at the most favourable rates and with a loan term of between 1 – 10 years.

Construction commencement: January 2021.

Construction completion: May 2022.


Project Profile

Project Details


Block A (Numbering)


Block B (Numbering)


Block C (Numbering)


plan


A BLOCK (INFRASTRUCTURE)


B BLOCK (INFRASTRUCTURE)


C BLOCK (INFRASTRUCTURE)


A BLOCK (1 + 1)


B BLOCK (1 + 1)


C BLOCK (1 + 1)


A BLOCK (2 + 1 duplex)


B BLOCK (2 + 1 duplex)


C BLOCK (2 + 1 duplex)


Project Features / Amenities

GENERAL FEATURES

Completion Date2022

Total number of floors5

Number of flats124

Distance to sea4000 m

Distance to center3000 m

Distance to Gazipaşa Airport30 km

INTERNAL FEATURES

  • 2+1 Penthouse
  • 3+1 Penthouse

EXTERNAL FEATURES

  • İnternet (Wi-Fi)
  • Generator
  • 7/24 Security
  • Fitness
  • Massage room
  • Steam room
  • Sauna
  • Outdoor swimming pool
  • Indoor swimming pool
  • Bath
  • Parking
  • Cinema
  • Children's Playground
  • Children's playroom
  • Spa
  • Fitness
  • Mini Club
  • Doorman
Price Starts from 73000 Price Ends On 75000

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.