Project By: Helmann

Project Gallery

Helmann Royal Port


HELMANN I RoyalPort is a project that combined company’s long years of expertise, leadership and professional stuff determined to work without compromising on quality.

The quality concept of HELMANN I RoyalPort has been prepared beyond today's standards following exclusively lastest European standards.

Private indoor car park, social activity area (45 m2), playground (32 m2), basketball court (136 m2), 2 swimming pools (310 m2), 2 children's pools (20 m2), ornamental pool (25 m2 ), 2 snack bars (40 m2), walking track (250 m), 2 sunbathing terraces (200 m2) and green area (1400 m2), everything that you and your loved ones need, and much more can be found at HELMANN I RoyalPort.

  • Children Playground
  • Security Point and 24/7 Security
  • Closed Circuit Monitoring System (CCTV)
  • Green Areas
  • Swimming Pools
  • Children Swimming Pools
  • Video intercom
  • Built – in Kitchen
  • Smart Home System
  • Fire Escape
  • Air conditioning
  • Generator
  • Disabled, Child and Elderly Solutions
  • Indoor parking
  • Elevator
  • Communication Between Apartments
  • Cable TV, Satellite TV
  • Artesian
  • Heat, Water and Sound Insulation

Project Profile

Project Brochure


1-2-3-4 Floor Plan Diagram


5 Floor Plan Diagram


Ground-Floor Plan Diagram


Project Features / Amenities

  • Children Playground
  • Security Point and 24/7 Security
  • Closed Circuit Monitoring System (CCTV)
  • Green Areas
  • Swimming Pools
  • Children Swimming Pools
  • Video intercom
  • Built – in Kitchen
  • Smart Home System
  • Fire Escape
  • Air conditioning
  • Generator
  • Disabled, Child and Elderly Solutions
  • Indoor parking
  • Elevator
  • Communication Between Apartments
  • Cable TV, Satellite TV
  • Artesian
  • Heat, Water and Sound Insulation
Price Starts from 1450000 Price Ends On 3325000

Want to know the latest pricing?
Fill out the form

1+1 Apartments

Total: 58
Available: 25
I am Interested

2+1 Apartments

Total: 10
Available: 5
I am Interested

3+1 Apartments

Total: 2
Available: 1
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.