Konak Premium

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Konak Construction

Project Gallery

Konak Premium


In the complex are located following: 3 big pools, a pool with hills, a pool with relaxation and recreation area and 2 paddling pools. There is a bar near the pool, a place for a brazier, an arbor and basketball platform and huge tennis courts. A covered car park is located above all blocks, SPA salon is located above A-B blocks, which will be on 3.000 m² and under L block SPA salon is located, which will  be on 6.000 m².
In the SPA salon are: an indoor pool, a restaurant, an Ottoman bath (boors), a steam room, a sauna, the salt room, rooms for massage, a restroom, fitness, Pilates yoga, billiard, a table tennis, a squate (tennis), a cinema hall, dressing rooms and bathrooms.
Technical characteristics: An antibacterial facade, noise – and water isolation. Spacious and modern elevator.  Fire-prevention alarm system. Central satellite systems. Protection and tracking cameras.
In apartments: steel doors, an on-door speakerphone with a video system. False ceilings and pointed hidden lighting. Washable paint on walls and floors from first class the granite. Porcelains, ceramics and developed by designer kitchens and bathrooms. Conditioners in all rooms, a home telephone number and double glass İtalian PVC windows and doors on balcony with noise isolation. The complex is located on the first coastline of the Mediterr0anean sea.

  • Smart Home Systems
  • Amphitheatre Lift
  • Separate Kitchen
  • Garden
  • Basketball
  • Caretaker
  • Billiards
  • Steam room
  • Cafe
  • Fitness
  • Parking
  • Garage
  • Security
  • Hamam
  • Internet
  • Jakuzzi
  • Generator
  • Indoor Pool
  • Lobby
  • Internet in lobby
  • Parking Lots
  • Playground
  • Private beach
  • Sauna
  • Cinema
  • Barbeque
  • Waterslides
  • Tennis cort
  • Outdoor Pool

Project Profile

Project Brochure


GARDEN DUPLEX LOWER FLOOR


ROOF DUPLEX UPPER FLOOR


ROOF DUPLEX LOWER FLOOR


NORMAL Floor Plan


Project Features / Amenities

  • Smart Home Systems
  • Amphitheatre Lift
  • Separate Kitchen
  • Garden
  • Basketball
  • Caretaker
  • Billiards
  • Steam room
  • Cafe
  • Fitness
  • Parking
  • Garage
  • Security
  • Hamam
  • Internet
  • Jakuzzi
  • Generator
  • Indoor Pool
  • Lobby
  • Internet in lobby
  • Parking Lots
  • Playground
  • Private beach
  • Sauna
  • Cinema
  • Barbeque
  • Waterslides
  • Tennis cort
  • Outdoor Pool
     
Price Starts from 360000 Price Ends On 1090000

Want to know the latest pricing?
Fill out the form

1+1 Apartments

Total: 174
Available: 60
I am Interested

2+1 Apartments

Total: 96
Available: 40
I am Interested

2+1 Garden duplex

Total: 58
Available: 30
I am Interested

3+1 Garden duplex

Total: 18
Available: 10
I am Interested

3+1 Duplex

Total: 58
Available: 30
I am Interested

4+1 Duplex

Total: 32
Available: 20
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.