Luna Loft

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Albimo AHM Construction

Project Gallery

Luna Loft By Albimo AHM Construction


Luna Loft - Our project, located in Mahmutlar, one of the attraction centers of Alanya, only two minutes' walk from the center, with all the social facilities of the city, attracts attention with its different design and architectural structure. Luna Loft, our project that we brought together with you at the end of a long working process; with its wide range of social facilities, you can increase your comfort level and life It will take your standards to the highest level. Our project, Luna Loft, consisting of a single block in an area of 1038 m²; It takes its name from the spacious and spacious apartments it houses. 

Albimo Ahm Loft is an AHM Project design. Our Luna Loft project is done by Albimo-AHM Construction. Luna Loft is only 450 m from the sea and is surrounded by the city and nature. are intertwined.

Basic Features

  • Fitness With Detached Garden 
  • Fireplace 
  • Playpen 
  • Outdoor 
  • Swimming Pool 
  • Sauna 
  • Fitness Center 
  • Indoor Swimming Pool 
  • Turkish Bath Steam 
  • Room Cafe 
  • Bars
  • Sea 450 meters

Project Profile

Project-Information


Social-Space-Plan


Basement-FLOOR-PLAN


Ground-1-2-3-FLOOR-PLAN


Fourth FLOOR-PLAN


Penthouse-Plan


Project Features / Amenities

  • Fitness With Detached Garden 
  • Fireplace 
  • Playpen 
  • Outdoor 
  • Swimming Pool 
  • Sauna 
  • Fitness Center 
  • Indoor Swimming Pool 
  • Turkish Bath Steam 
  • Room Cafe 
  • Bars
  • Sea 450 meters
Price Starts from 103500 Price Ends On 157500

Want to know the latest pricing?
Fill out the form

1+1 : 8

Total: 31
Available: 8
I am Interested

2+1 :1

Total: 3
Available: 1
I am Interested

3+1 :3

Total: 5
Available: 3
I am Interested

3+1 Duplex :2

Total: 3
Available: 2
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.