Momentum

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Tokus Insaat

Project Gallery

Momentum


Our project is located on the right (west side) of the old state hospital. Our project is being established on a 3751 m2 land. The distance to the sea is 700 meters. Our project consists of 2 blocks. Each flat is 263 m2 net and 280 m2 gross 5+1 Penthouse.

  • Fitness
  • Cafebar Sauna
  • Steam Room
  • Jacuzzi
  • Central Living Room
  • Outdoor Parking Lot
  • Gym
  • Generator
  • Pool Bar
  • Indoor And Outdoor Children's Playground
  • Garden Lighting
  • Security Booth
  • 24/7 Security
  • Male And Female Wc And Shower.

Building And Flat Features;

  • Having An Energy Identity
  • Heat And Water Insulated Facade And Roof Coverings
  • Building Facade Cladding
  • Exterior Joinery In Luxury Series
  • Anthracite Color With Heat Glass
  • Entrance Door Made Of Decorative Iron Wrought Iron
  • One Spare Water Tank And Water Booster System Will Be Installed
  • Exterior  Juton  Brand Paint
  • Video And Audible Bell System
  • Mailbox
  • Tse Certified Modern Elevator
  • 1st Class Marble Flooring In The Interior Halls Of The Building
  • Sound And Water Insulation Between Neighboring Apartments
  • Central Satellite Systems Are Available

Project Profile

Project Brochure


LOWER FLOOR PLAN 1024x682


TOP FLOOR PLAN 1024x682


Plan


Project Features / Amenities

  • Fitness
  • Cafebar Sauna
  • Steam Room
  • Jacuzzi
  • Central Living Room
  • Outdoor Parking Lot
  • Gym
  • Generator
  • Pool Bar
  • Indoor And Outdoor Children's Playground
  • Garden Lighting
  • Security Booth
  • 24/7 Security
  • Male And Female Wc And Shower.

 

Building And Flat Features;

  • Having An Energy Identity
  • Heat And Water Insulated Facade And Roof Coverings
  • Building Facade Cladding
  • Exterior Joinery In Luxury Series
  • Anthracite Color With Heat Glass
  • Entrance Door Made Of Decorative Iron Wrought Iron
  • One Spare Water Tank And Water Booster System Will Be Installed
  • Exterior  Juton  Brand Paint
  • Video And Audible Bell System
  • Mailbox
  • Tse Certified Modern Elevator
  • 1st Class Marble Flooring In The Interior Halls Of The Building
  • Sound And Water Insulation Between Neighboring Apartments
  • Central Satellite Systems Are Available
Price Starts from 280000 Price Ends On 60000000

Want to know the latest pricing?
Fill out the form

3+1 Apartments

Total: 14
Available: 6
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.