Novusky

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Aydemir Construction

Project Gallery

Novus Sky


Novus Sky Project has been prepared at a very high level in terms of social areas; Outdoor-indoor swimming pool, Turkish bath, sauna, children’s playground, fitness, parking garage, and reception area are just a few of them.
Our project, which is inter twined with social areas and city life, covers an area of 3350 square meters.
There are different apartment options such as 1+1, 2+1, and 4+1 in the complex consisting of 2 blocks and 12 floors.
In addition to being 120 meters from the sea, our project is located in a position to meet all your needs with cafe, restaurant, bar, and shopping center options around it. Steel doors, interior automation systems, special size ceramics on the surfaces that receive water, antibacterial walls for your health, and insulated exterior materials are used in our apartments.
In addition to these, our project includes 24-hour private security systems, generators, and fire detectors.
Under the as surance of Aydemir Group, it is covered by a 5-year warranty as 2 years of construction in electricity and water installations.

Mahmutlar has a fantastic location 10 km east of Alanya, with the majestic Taurus mountains as a backdrop and the beautiful Mediterranean in the front. Mahmutlar stretches about 5 km, from Kestel to the west to Kargicak to the east, and is one of Alanyas largest suburbs.Many holidaymakers and property buyers chose Mahmutlar because of its lovely atmosphere and relaxed lifestyle. The area is mainly consisting of private residences and apartments, and not as many hotels, making the place lively all year round, because of the property owners spending their time here at all times of the year, many of them coming here when the weather gets too cold in their home countries. It is also a very international and welcoming environment with residents from many different countries, in addition to the locals.

  • INDOOR SWIMMING POOl
  • OUTDOOR SWIMMING POOL
  • AQUPARK
  • CAMELLIA REST AREA
  • PLAY GROUND
  • CHILDREN’S PLAY AREA
  • PERGOLE SEATING AREA
  • SPORTS ACTİVİTY AREA
  • TURKISH BATH
  • SAUNA
  • SECURITY CAMERA
  • 7/24 SECURITY
  • PARKING GARAGE
  • GENERATOR

Project Profile

project brochure


Plan-of-A-block-floor-num


Plan-of-A-block-normal-floors


A-block-1+1(flat-plan)


A-block-2+1(flat-plan)


A-block-4+1(flat-plan)


A-block-duplex-(lower-floor)


A-block-duplex-(upper-floor)


Plan-of-B-block(floor-num)


Plan-of-B-block(normal-floor)


B-block-duplex-(lower-floor)


B-block-duplex-(upper-floor)


Plan-of-B-block(10-floor)


Project Features / Amenities

  • INDOOR SWIMMING POOl
  • OUTDOOR SWIMMING POOL
  • AQUPARK
  • CAMELLIA REST AREA
  • PLAY GROUND
  • CHILDREN’S PLAY AREA
  • PERGOLE SEATING AREA
  • SPORTS ACTİVİTY AREA
  • TURKISH BATH
  • SAUNA
  • SECURITY CAMERA
  • 7/24 SECURITY
  • PARKING GARAGE
  • GENERATOR
Price Starts from 140000 Price Ends On 580000

Want to know the latest pricing?
Fill out the form

1+1 apartment

Total: 48
Available: 19
I am Interested

2+1 apartment

Total: 40
Available: 8
I am Interested

4+1 apartment

Total: 4
Available: 4
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.