Oba SultanResidance

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Cimrin Construction

Project Gallery

Oba Sultan Residance


 Oba is a prestigious area of the city, with low European style buildings, located closest to the center of Alanya. It is also famous for the number of private schools and colleges. There are educational institutions very close to our project: Bahcesehir koleji, Bil okulları, Alanya Amerikan Kultur koleji. The area is growing and developing rapidly as well as prices of the property.

TECHNICAL FEATURES
● 1 elevator
● WIFI internet both in common areas and all units
● Satellite TV connection to each unit
● Diesel backup generator for electricity failures
● LED based light solutions in common areas and units
SAFETY AND SECURITY
● Single entry to the complex
● Walls around the complex
● Caretaker apartment
● IP Surveillance cameras outdoor and also in common indoor areas
INDOOR FACILITIES
● SPA Center:
- Indoor heated swimming pool
- Sauna
- Dressing rooms
- Shower and WC
● Fitness room with professional equipment
● Lobby and kitchen for residents of the complex
OUTDOOR FACILITIES
● Outdoor swimming pool
● Children swimming pool
● Sun loungers by the pool
● Children playground
● Barbecue area
● Landscaped garden
RESIDENCE/APARTMENT FEATURES
● Aluminum frame windows and sliding doors
● All windows and sliding doors with ISICAM KONFOR special heat-insulative glasses
● Ceramic floors
● Decorative LED light systems and LED spotlights on the ceilings
● Steel entrance doors
● Electrical floor heating in all apartments in all rooms
● Sound insulation between apartments
● Intercommunication system
KİTCHEN
● Lacquer painted modern cupboard and doors
● Granite worktop
● Tectonite sink
● Modern LED light
● Accessories
BATHROOM
● Modern bathroom cupboard with mirror and LED lights
● Electrical floor heating
● Instant water heater
● Shower cabin with tempered special glasses
● Air ventilation unit
● Water isolation on the floor and the walls


Project Profile

project brochure


ground-floor-plan


1-floor-plan


2-floor-plan


3-floor-plan


4-floor-plan


5-floor-plan


Project Features / Amenities

TECHNICAL FEATURES
● 1 elevator
● WIFI internet both in common areas and all units
● Satellite TV connection to each unit
● Diesel backup generator for electricity failures
● LED based light solutions in common areas and units
SAFETY AND SECURITY
● Single entry to the complex
● Walls around the complex
● Caretaker apartment
● IP Surveillance cameras outdoor and also in common indoor areas
INDOOR FACILITIES
● SPA Center:
- Indoor heated swimming pool
- Sauna
- Dressing rooms
- Shower and WC
● Fitness room with professional equipment
● Lobby and kitchen for residents of the complex
OUTDOOR FACILITIES
● Outdoor swimming pool
● Children swimming pool
● Sun loungers by the pool
● Children playground
● Barbecue area
● Landscaped garden
RESIDENCE/APARTMENT FEATURES
● Aluminum frame windows and sliding doors
● All windows and sliding doors with ISICAM KONFOR special heat-insulative glasses
● Ceramic floors
● Decorative LED light systems and LED spotlights on the ceilings
● Steel entrance doors
● Electrical floor heating in all apartments in all rooms
● Sound insulation between apartments
● Intercommunication system
KİTCHEN
● Lacquer painted modern cupboard and doors
● Granite worktop
● Tectonite sink
● Modern LED light
● Accessories
BATHROOM
● Modern bathroom cupboard with mirror and LED lights
● Electrical floor heating
● Instant water heater
● Shower cabin with tempered special glasses
● Air ventilation unit
● Water isolation on the floor and the walls

Price Starts from 132000 Price Ends On 355000

Want to know the latest pricing?
Fill out the form

1+1 apartment

Total: 9
Available: 9
I am Interested

2+1 apartment

Total: 8
Available: 4
I am Interested

4+1 duplex

Total: 3
Available: 1
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.