OXO-Nest-44

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: OXO Constructıon

Project Gallery

OXO-Nest-44


MODERN LIVING IN THE HEART OF THE CITY
If the uninterrupted view of a picturesque horizon is a must have for your villa, then look no further than our selection of exceptional exclusive villas with an infinity pool in the Mediterranean.

In addition to a superb private villa with an infinity pool you can also an expect service from our expert team before, during and after you buy. Think Exquisite villas are the crème de la crème of in Alanya, the very best villas currently available in our regions.

LIVE THE EXTRAORDINARY
If the uninterrupted view of a picturesque horizon is a must have for your villa, then look no further than our selection of exceptional exclusive villas with an infinity pool in the Mediterranean. In addition to a superb private villa with an infinity pool you can also an expect service from our expert team before, during and after you buy.

LUXURY IS MADE
Think Exquisite villas are the crème de la crème of in Alanya, the very best villas currently available in our regions. Luxury can be many things but our Think Exquisite properties offer a seductive mixture of attentive, discreet production to cater for your needs, sophisticated, elegant interiors, glorious gardens and grounds, enviable positions, sublime panoramas and an extensive range of top-quality amenities. If only the best will do, look no further than Think Exquisite!

CONVENIENT TRANSPORTATION
You are only 0 km away from the sea and beach, close to all amenities of the city centre of Alanya.Transportation is available by city buses which pass near the site every 10 minutes or by taxis that arrive.

HUMAN-CENTERED DESIGN NATURAL SPACES
Clean air, natural beauty, a view of the city and the sea, rich vegetable and fruit varieties right from the soil, to your table. Colorful lower gardens with basilscented walkways for your enjoyment of jogging a healthy and peaceful life.

TURKISH BATH AND SWIMMING POOL
Indoor and outdoor swimming pools for your swimming enjoyment summer and winter. Healthy days with saunas and steam rooms. Experience the relaxation in the Turkish bath and massage. A life full of sports with the gym available

ENJOY LIFE WITH SOCIAL ACTIVITIES
With the mini movie theater, you can enjoy your own gala for every movie you’d like. Fun times with billiards, table tennis and air hockey. A children play club in which your children can safely play.

ALL THINKED FOR YOUR COMFORT
Playstation saloon, variety of impressive games and excitement packed hours. Security system offers a secure and safe environment with video monitoring system. Unlimited internet in common places with free wireless connection.

ALANYA NATURE AND HISTORY
You become the witness who with great pleasure enjoys the magnificient sunset and sunrising scenery offered by the Mediterranean, the city of Alanya and its castle. You are at the centre of the historical Alanya.


Project Profile

Project Brochure


B1


B2


B3


C1


C2


C3


E1


E2


E3


Project Features / Amenities

CONVENIENT TRANSPORTATION
You are only 0 km away from the sea and beach, close to all amenities of the city centre of Alanya.Transportation is available by city buses which pass near the site every 10 minutes or by taxis that arrive.

HUMAN-CENTERED DESIGN NATURAL SPACES
Clean air, natural beauty, a view of the city and the sea, rich vegetable and fruit varieties right from the soil, to your table. Colorful lower gardens with basilscented walkways for your enjoyment of jogging a healthy and peaceful life.

TURKISH BATH AND SWIMMING POOL
Indoor and outdoor swimming pools for your swimming enjoyment summer and winter. Healthy days with saunas and steam rooms. Experience the relaxation in the Turkish bath and massage. A life full of sports with the gym available

ENJOY LIFE WITH SOCIAL ACTIVITIES
With the mini movie theater, you can enjoy your own gala for every movie you’d like. Fun times with billiards, table tennis and air hockey. A children play club in which your children can safely play.

ALL THINKED FOR YOUR COMFORT
Playstation saloon, variety of impressive games and excitement packed hours. Security system offers a secure and safe environment with video monitoring system. Unlimited internet in common places with free wireless connection.

ALANYA NATURE AND HISTORY
You become the witness who with great pleasure enjoys the magnificient sunset and sunrising scenery offered by the Mediterranean, the city of Alanya and its castle. You are at the centre of the historical Alanya.

Price Starts from 3475000 Price Ends On 3475000

Want to know the latest pricing?
Fill out the form

4+1 Villa

Total: 4
Available: 3
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.