Rengi Antalya

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Rengi Antalya Karaaslan İnşaat

Project Gallery

RENGİ ANTALYA


RENGİ ANTALYA WILL BRING COLOUR TO YOUR LIFE.
Shopping at the stores just below your home is a certain kind of delight.
Department stores with the latest fashion trends, cheerful cafés to spend time in, shops to meet your daily necessities…
You are at the center of life in Rengi Antalya.DIFFERENT KIND OF COMFORT AT EACH CORNER OF RENGI ANTALYA…

All apartment options that you can choose depending on your lifestyle whether 1+1, 2+1 or 3+1 have been designed for your perception of “comfortable life”. You will experience all privileges of a luxurious life with high quality materials and good craftsmanship dedicated to every inch of your apartment.STRESS-FREE AND HEALTHY LIFE WITH RENGI ANTALYA…
Designed with the utmost care, Turkish Bath and Spa Facilities are among the most indispensable traits at Rengi Antalya. Offering elaborately decorated rooms, distinct choices and exotic scents, our Spa Facility is the place to be for those who need positive energy.RENGI ANTALYA IS THE FOCAL POINT OF NATURE, PEACE AND SAFETY…
Feeling safe is the most fundamental need, rather than a privilege. You will always feel safe thanks to expert security staff and state-of-the-art security infrastructure provided at Rengi AntalyaRENGİ ANTALYA, YOUR NEW LIFESTYLE…
While relaxing at the living room with a unique atmosphere, be proud of yourself for entertaining your guests in such a great ambiance. If you can go to sleep with ease, it means you have become part of the peaceful world of Rengi Antalya. A positive and effective day waits when you get up from a comfortable sleep. Thanks to built-in appliances, making dishes in your exclusive kitchen as well as catching the smiles on your guests’ faces will be a joy for you.

  • Lift
  • Steam room
  • Security
  • Turkish Bath HydrophoreHeat Insulation
  • Generator
  • Cable TV
  • Camera system
  • Covered Garage
  • Doorman
  • Nursery
  • Private Pool
  • Car park
  • Playground
  • Sauna
  • Sound insulation
  • siding
  • Sports Field

C,D,E,block (1+1-floor-plan)


C,D,E-block (2+1 floor plan)


J,K,L,M-block (2+1 floor plan))


A,F-block-(3+1-floor-plan)


B,H-block(3+1-floor-plan)


J,K,L,M-block-(3+1-floor-plan)


A,F block (4+1 floor plan)


B,H-block(5+1-floor-plan)


Project Features / Amenities

  • Lift
  • Steam room
  • Security
  • Turkish Bath HydrophoreHeat Insulation
  • Generator
  • Cable TV
  • Camera system
  • Covered Garage
  • Doorman
  • Nursery
  • Private Pool
  • Car park
  • Playground
  • Sauna
  • Sound insulation
  • siding
  • Sports Field
Price Starts from 68250 Price Ends On 189000

Want to know the latest pricing?
Fill out the form

1+1 apartment

Total: 301
Available: 40
I am Interested

2+1 apartment

Total: 220
Available: 23
I am Interested

3+1 apartment

Total: 110
Available: 37
I am Interested

4+1 apartment

Total: 80
Available: 17
I am Interested

5+1 apartment

Total: 50
Available: 10
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.