Royal Grand Exclusive

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Royal Construction

Project Gallery

Royal Grand Exclusive


Royal Grand Exclusive is located in the city centre on Mehmet Akif Ersoy street. The distance from the building to Antalya airport is 120 km, to Gazipaşa airport is 40 km and to Alanya sea port is just 2 km.
There are no problems with movement and transportation because of highway and ring road crossing are in close proximity of the project.
There are all necessary institutions as hospital, bank, school are in walking distance from the Royal Towers. There are bazaar and sea food market as well just in a few steps away where you can find the freshest products of the season. Stores, supermarkets, cafes and restaurants are in the same line with the project and famous “Cleopatra” where the Blue flag set is 500 metres away.

Social facilities:

  • Social facilities were designed specially to provide an appropriate life quality level and for your comfortable pastime with your friends and family.
  • So, in order to make you feel free and relaxed in your apartment there are:
  • Outdoor pool
  • Indoor pool
  • Children pool
  • Pool bar
  • Turkish bath
  • Sauna
  • Fitness
  • Cafeteria
  • Children playing area
  • Management office
  • and some hotel type rooms for your guests.
  • Technical features:
  • Building:
  • Satellite TV system
  • Wi-Fi system
  • Two elevators
  • Two generators
  • Hydrophore
  • Water tanks

Flats:

  • İnstant water heater
  • Air conditioner structure
  • Suspended ceiling
  • Recessed lights
  • Washable wall paint
  • Ceramic floors
  • Bathroom and kitchen furniture
  • Aluminium glazing
  • Guardrails at balcony are made of aluminium and tempered glass
  • First class wash basin, sink, shower cabin and lamps

Security and environment:
Details which will make you feel safe on the project territory:

  • Fire exit/entry, fire escape with exit direction signs
  • Steel doors
  • Video surveillance system
  • Diaphone (intercom) video system
  • Emergency meeting points

Project Profile

Project Brochure


1-7 Floor Plans


Duplex Lower Floor Plan


Duplex Roof Floor Plan


Ground Floor Plan


Project Features / Amenities

Social facilities:

  • Social facilities were designed specially to provide an appropriate life quality level and for your comfortable pastime with your friends and family.
  • So, in order to make you feel free and relaxed in your apartment there are:
  • Outdoor pool
  • Indoor pool
  • Children pool
  • Pool bar
  • Turkish bath
  • Sauna
  • Fitness
  • Cafeteria
  • Children playing area
  • Management office
  • and some hotel type rooms for your guests.
  • Technical features:
  • Building:
  • Satellite TV system
  • Wi-Fi system
  • Two elevators
  • Two generators
  • Hydrophore
  • Water tanks

Flats:

  • İnstant water heater
  • Air conditioner structure
  • Suspended ceiling
  • Recessed lights
  • Washable wall paint
  • Ceramic floors
  • Bathroom and kitchen furniture
  • Aluminium glazing
  • Guardrails at balcony are made of aluminium and tempered glass
  • First class wash basin, sink, shower cabin and lamps

Security and environment:
Details which will make you feel safe on the project territory:

  • Fire exit/entry, fire escape with exit direction signs
  • Steel doors
  • Video surveillance system
  • Diaphone (intercom) video system
  • Emergency meeting points
Price Starts from 188500 Price Ends On 393120

Want to know the latest pricing?
Fill out the form

1+1 Apartments

Total: 81
Available: 43
I am Interested

2+1 Duplex Apartments

Total: 3
Available: 3
I am Interested

3+1 Duplex Apartments

Total: 3
Available: 3
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.