Ruby Tower Mahmutlar

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Ruby Alanya Construction

Project Gallery

Ruby Tower Mahmutlar


The most popular tourist destination in Alanya, is about to take its place among the emblematic buildings that are distinguished by their modern architecture and quality of construction.
In the 12-storey residential complex are planned 120 apartments of various types, which open the doors of prestigious life thanks to their social facilities, which will ensure comfortable and qualitative life for the owners at the highest level.
Аpartments types:

  • 1 + 1 = 49-55 m2
  • 2 + 1 = 73 m2
  • Duplex = 101-209 m2
  • Pool bar and cafe
  • Indoor-outdoor pools
  • Children's swimming pool
  • Water slide in the pool
  • Gym
  • Sauna
  • Steam room
  • Turkish baths
  • Massage rooms
  • Children's playroom
  • Children's playground
  • Reception and lobby
  • Tennis court
  • Mini golf
  • Pergola
  • BBQ area
  • Car park
  • 7/24 security and CCTV camera
  • Generator

Apartment facilities:

  • Entrance steel door
  • Interior quality lacquered doors
  • Built-in kitchen set
  • Granite countertop
  • Granite on the floors
  • 1 grade ceramic tile on bathroom floors and walls
  • Bathrooms fully equipped with plumbing fixtures and built-in furniture
  • LED and spotlights on the ceiling
  • Balcony doors and PVC double glazed windows
  • Video intercom
  • Central satellite syst

Project Profile

Project Brochure


1+1 2+1


Duplex plan


duplex roof


Social Area


Project Features / Amenities

  • Pool bar and cafe
  • Indoor-outdoor pools
  • Children's swimming pool
  • Water slide in the pool
  • Gym
  • Sauna
  • Steam room
  • Turkish baths
  • Massage rooms
  • Children's playroom
  • Children's playground
  • Reception and lobby
  • Tennis court
  • Mini golf
  • Pergola
  • BBQ area
  • Car park
  • 7/24 security and CCTV camera
  • Generator

Apartment facilities:

  • Entrance steel door
  • Interior quality lacquered doors
  • Built-in kitchen set
  • Granite countertop
  • Granite on the floors
  • 1 grade ceramic tile on bathroom floors and walls
  • Bathrooms fully equipped with plumbing fixtures and built-in furniture
  • LED and spotlights on the ceiling
  • Balcony doors and PVC double glazed windows
  • Video intercom
  • Central satellite syst
Price Starts from 99000 Price Ends On 261000

Want to know the latest pricing?
Fill out the form

1+1 Apartments

Total: 99
Available: 8
I am Interested

2+1 Apartments

Total: 11
Available: 1
I am Interested

2+1 Duplex Apartments

Total: 6
Available: 1
I am Interested

5+1 Duplex Apartments

Total: 2
Available: 2
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.