Sonas Prime

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Topcu Grup

Project Gallery

sonas prime


Complex infrastructure: large outdoor swimming pool, 102 cars capacity indoor carparking, water park with slides, children's pool, pool bar, children's outdoor playground, indoor children's playroom, billiards, table tennis, cinema, golf simulation room, SPA center, barbecue, 24/7 security.
Inside the SPA center: indoor heated pool, hammam, steam room, Finnish sauna, massage rooms, relaxation area, fitness center, yoga and Pilates room.
Technical characteristics: antibacterial coating of the facade, first-class noise, heat and water insulation, modern elevators, fire protection system, central satellite system, generator, video surveillance.
Features of the apartments: armored steel doors of the 1st class, intercom with video system. Suspended ceilings with built-in spotlights. Washable paint on the walls, flooring to choose from: laminate and porcelain stoneware. Floor heating system throughout the apartment. First-class plumbing, designer kitchen and bathroom furniture. Aluminum roller shutters and double glazing ensure soundproofing in all rooms.
A set of household appliances, air conditioners in every room and underfloor heating as a gift to every customer!
Our complex is located on the first coastline, which guarantees you species characteristics and a stable price increase.
To the center of Alanya - 15 km.
Gazipasa Airport - 27 km.
Antalya Airport - 140 km.

  • Features of the apartments:
  • armored steel doors of the 1st class,
  • intercom with video system.
  • Suspended ceilings with built-in spotlights.
  • Washable paint on the walls,
  • flooring to choose from:
  • laminate and porcelain stoneware.
  • Floor heating system throughout the apartment.
  • First-class plumbing,
  • designer kitchen and bathroom furniture.
  • Aluminum roller shutters
  • double glazing ensure soundproofing in all rooms.

Project Profile

project brochure


A-block(normal-floor-plan)


A-block(normal-floor-plan-calculation)


A-block(loft-flat-upper-floor-plan measurement)


A-block(loft-flat-upper-floor-plan)


A-block(loft-flat-lower-floor-plan)


A-block(loft-flat-lower-floor-plan-measurement)


A-block(duplex-lower-floor-plan)


A-block(duplex-lower-floor-plan measurement)


A-block(duplex-upper-floor-plan)


A-block(duplex-upper-floor-plan measurement)


Project Features / Amenities

Features of the apartments:

  • armored steel doors of the 1st class,
  • intercom with video system.
  • Suspended ceilings with built-in spotlights.
  • Washable paint on the walls,
  • flooring to choose from:
  • laminate and porcelain stoneware.
  • Floor heating system throughout the apartment.
  • First-class plumbing,
  • designer kitchen and bathroom furniture.
  • Aluminum roller shutters
  • double glazing ensure soundproofing in all rooms.
Price Starts from 276500 Price Ends On 1250000

Want to know the latest pricing?
Fill out the form

1+1 apartment

Total: 116
Available: 96
I am Interested

2+1 apartment

Total: 44
Available: 20
I am Interested

2+1 duplex

Total: 7
Available: 7
I am Interested

4+1 duplex

Total: 2
Available: 2
I am Interested

5+2 duplex

Total: 2
Available: 2
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.