The Cruise Collection

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Ka Collection

Project Gallery

The Cruise Collection


In the project, which includes 174 flats, including 1 office, 1+1's - 87 m², 2+1's 110 to 145 m² and 3+1's 163 to 186 m². All apartments are on the south side and also all of them see the social areas. Are you ready to go on a Cruise with luxury apartments with comfortable and spacious terraces on the upper floors, surrounded by social themes, where you can feel the gardens and villa life on the ground floors?


While we are feeling the effects of global warming and climate change more and more every day, we are adopting the sustainabi lity philosophy in our project and using renewable energy systems in social facilities. We can generate the energy we will use in social areas ourselves, with 2 electric charging units in our indoor parking and solar panels located in the gardens.


Our collection is located 5 km from the world-famous Lara/Kundu hotels, 1 km from Antalya Airport, the center of tourism, 1 km from private schools, 4.5 km from shopping centers such as Mall of Antalya, Agora, Ikea. Feel the sea, sand and sun together at our beach, which is specially rented for The Cruise. We provide a free transfer service every two hours to our private and free beach, to key points such as the airport and shopping mall. Let us consider all the details while you live. With our Concierge services that you can benefit from after the sale, we are always with you, from housekeeping system to veterinary services for your pets, from VIP car rental to hosting guests and private flat rental opportunities.

Are you ready to keep a logbook on The Cruise, where you will feel the hotel service every day.


Project Profile

Project Brochure


Project Flooring 1+1 Plan


Project Flooring 2+1 Plan


Project Flooring 2+1 Type 2 Plan


Project Flooring 2+1 Type 3 Plan


Project Flooring 3+1 Plan


Project Flooring 3+1 Type 2 Plan


Project Flooring 3+1 Type 3 Plan


Floor 1 Plan


Floor 2 Plan


Floor 3 Plan


Floor 4 Plan


Floor 5 Plan


Floor 6 Plan


Floor 7 Plan


Floor 8 Plan


Floor 9 Plan


Floor 10 Plan


Floor 11 Plan


Penthouse


Ground-Floor


Basement-Plan


Project Features / Amenities

  • Building Features
  • Lobby / Reception
  • Compliant with earthquake regulations
  • Indoor Parking ( w/2 Electric Vehicle Charge Units)
  • Compliant with building control regulations
  • Outdoor Parking
  • Compliant with fire regulations
  • Tennis and Basketball Court
  • Ground Surveyed
  • Walking Track
  • Generator
  • Meeting Room & Library
  • Hidden Air Conditioning Unit
  • Fitness / Sauna / Steam Room
  • First Quality Insulation
  • Outdoor Swimming Pool
  • Elevators
  • Indoor Swimming Pool
  • Aquapark
  • Children's Playground
  • Mini Club
  • Private Beach (Free Entry)
  • Free Transfer (To Beach, Airport and Shopping Centers)
  • BBQ Area
  • TV & Satellite System
  • Playgrounds (Bowling, Billiards, Darts, Foosball, Playstation, Cinema)
  • 7/24 Security & Camera System
  • Cafe & Bar
  • Solar Energy Systems (Some of the energy used in social areas will be produced with Solar Panels.)
  • 21 Medical Room
  • Apartment Features
  • Concierge Services
  • Hospitality Services
  • Cooling System
  • Heating System
  • Combi (w/Electric)
  • Underfloor Heating
  • Aluminum Systems in Doors and Windows
  • Kitchen and Bathroom Cabinets and American Doors Lacquered
  • Grounds 60*120 Ceramic or equiv.
  • Shower Cabin
  • Steel Door
Price Starts from 88000 Price Ends On 250000

Want to know the latest pricing?
Fill out the form

1+1 Apartment

Total: 121
Available: 84
I am Interested

2+1 Apartment

Total: 36
Available: 10
I am Interested

3+1 Apartment

Total: 12
Available: 9
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.