Twin Towers 2 Centre Alanya

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Konak Construction

Project Gallery

Twin Towers 2 Centre Alanya


TWIN TOWERS 2
Konak Twin Towers 2 Projesi 2.902 m2 arsa alanından oluşmaktadır. Alanya şehir merkezinde 2
blok 115 daireden oluşan, 1+1,2+1 normal daire ve 2+1, 3+1, 4+1 Dubleks dairelerden oluşmaktadır.
Çarşı merkezine 900 mt., Kleopatra plajına 600 mt. mesafededir. Deniz ve Kale manzarasına hakim
bir konumu vardır.
Ortak Alanlar: Kapalı Otopark, Kapıcı, 24 Saat Güvenlik, Açık Yüzme Havuzu, Kapalı Yüzme Havuzu,
Fitness, Türk Hamamı, Buhar Odası, Masaj Odası, Sauna, Havuz Bar, Çocuk Oyun Parkı, İnternet,
Uydu Sistemi
Adres; KIZLAR PINARI MAH. SPOR CAD. NO : 25 A/B , 07400 Alanya . ANTALYA.
https://www.google.com/maps/dir//KIZLAR+PINARI+MAH.+SPOR+CAD.+NO+:+25+A%2FB+760+ADA
+1+PARSEL,+07400+Alanya,+Turkey/@0,0,22z/data=!4m6!4m5!1m0!1m2!1m1!1s0x14dca31878f25
63f:0xa727fc5498b6a3d4!3e0?gl=us
Konak Twin Towers 2 Project consists of a land area of 2,902 m2. It consists of 2 blocks 115 flats,
1+1,2+1 regular flats and 2+1, 3+1, 4+1 duplex flats in Alanya city center. 900 meters to the center of
the bazaar, 600 meters to the Cleopatra beach. is at a distance. It has a position that dominates the
sea and the castle view.
Common Areas: Indoor Parking Lot, Doorman, 24 Hour Security, Outdoor Swimming Pool, Indoor
Swimming Pool, Fitness, Turkish Bath, Steam Room, Massage Room, Sauna, Pool Bar, Children's
Playground, Internet, Satellite System.


Project Profile

Project Information


4,8-floor-BlockA


4,8-floor-BlockB


duplex-groundfloor-BlockA


duplex-groundfloor-BlockB


duplex-upperfloor-BlockA


duplex-upperfloor-BlockB


Project Features / Amenities

Indoor Parking Lot

Doorman

24 Hour Security

Outdoor Swimming Pool

Indoor Swimming Pool

Fitness

Turkish Bath

Steam Room

Massage Room

Sauna

Pool Bar

Children's Playground

Internet

Satellite System

Price Starts from 472000 Price Ends On 696000

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.