Twin Towers 3 Centre Alanya

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Konak Construction

Project Gallery

Twin Towers 3


TWIN TOERS 3 Konak Twin Towers 3 Project consists of a land area of 4.467 m2. 2 in Alanya city center The block consists of 144 flats. 900 meters to the center of the bazaar, 600 meters to the Cleopatra beach. is at a distance.

It has a position that dominates the sea and the castle view. The structure itself is produced with a reinforced concrete frame system. Exterior walls and interior walls are light It consists of pumice blocks known as material.

Indoor with its own garden planted with full height trees, green grass, palm trees and bushes area. Wide walking paths and rest area Double windows. Aluminum joinery with heat glazing. High sound insulation. 30% UVC protection. Interior doors. Furniture will be doors - MDF, Entrance doors- Steel door.

These apartments are:

A block

- 46 units (1+1, 60 m2)

- 16 units (2+1,87 m2)

- 6 units (2+1 duplex, 116 - 120 m2)

- 2 units (2+1 garden duplex, 110 and 120 m2)

2 units (4+1 duplex, 197 m2)

B block

- 45 units (1+1, 60 - 62 m2)

- 16 units (2+1,87 m2)

- 6 units (2+1 duplex, 116 -120 m2)

- 2 units (2+1 garden duplex, 110 and 120 m2)

- 1 piece (3+1 garden duplex, 140 m2)

- 2 units (4+1 duplex, 197 m2)

We are waiting for you in our project. Spacious apartments with a new life style prepared in the common area accompanied by high quality social facilities. Our TWIN TOWERS 3(CLEOPATRA TWIN TOWERS II) will be constructed on 4,467 m2 land.This project, consisting of 2 blocks, is 600 meters away from the Cleopatra beach, one of the most famous beaches of the Mediterranean. Antalya airport is 125km while Gazipasa airport is 40km away. There are 144 flats, duplexes and garden duplexes in the complex, in 2 different blocks. These apartments are: -91 flats (1+1 ,62 m2) -32 flats (2+1,87 m2) -12 duplexes (2+1,116 and 120 m2) -4 garden duplexes (2+1,110 and 120 m2) -4 duplexes (4+1,187 m2) -1 garden duplex (3+1,140 m2)


Project Profile

Project Information


1to7-floor


basement-floor-BlockA


duplex-groundfloor


duplex-upperfloor


ground-floor-BlockA


Project Features / Amenities

Gym

Turkish bath

Sauna

Massage room

Children's play ground

Camellia -Indoor parking lot(Garage)

Security and Information desk

Care taker

Security camera

swimming pool

Indoor swimming pool

Price Starts from 252000 Price Ends On 730000

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.