Victory Garden

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Kyt Yapi

Project Gallery

Victory Garden


Located in the heart of the new and upcoming center of Alanya, which means that all facilities are within walking distance, offering residents an excellent second home experience away from the heavy traffic.
The complex will consist of seven 4-story residential blocks, 178 apartments with different layouts that range from 53 m² to 140 m². The properties are modern in design and timeless in style with one, two, and three-bedroom apartments. These new apartments are ideal as an investment or for your own use as a holiday or permanent stay for your retirement.
All apartments are fitted with high-quality materials around the floors, walls, and rooms such as the kitchen and bathroom. Victory Garden is an excellent investment in luxury real estate, located in an area of 14,900 m². The social areas will be decorated with lots of plants, beautiful green grass, and a gorgeous fountain.


Project Profile

Project Profile


A-B block floor plan


A-B block floor plan


A-B block floor plan


A-B Block duplex ground floor


A-B block ground floor plan


C block floor plan


C block floor plan


C block Duplex floor plan


F-G block ground floor plan


F-G block Floor plan


F-G block Floor plan


F-G block Floor plan


F-G block duplex floor


Project Features / Amenities

  •  Wi-Fi around the pool and social areas
  •  Camera system
  •  Backup generator
  •  Gym
  •  Sauna
  •  Spa
  •  Pool
  •  Elevator
  •  Showers near the swimming pool
  •  Indoor swimming pool
  •  Security guards
  •  Barbeque area
  •  Turkish bath
  •  Cable TV - Satellite
  •  Open Car Park
  •  Indoor carpark
  •  Cinema room
  •  Meeting room
  •  Snow room
Price Starts from 125500 Price Ends On 235500

Want to know the latest pricing?
Fill out the form

1+1 Apartment

Total: 56
Available: 21
I am Interested

2+1 Apartment

Total: 22
Available: 10
I am Interested

2+1 Duplex

Total: 17
Available: 10
I am Interested

3+1 Duplex

Total: 12
Available: 8
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.