Vista Orange Kargicak

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Topcu Grup

Project Gallery

Vista Orange


Consisting of two blocks and totally 45 apartments complex is just 200 meters away from the beach. As well as two-three room apartments, there are double and single-floor penthouse options. You can choose the most suitable apartment layout from the options offered. In addition to rich social facilities such as a fitness centre, outdoor swimming pool, Turkish bath, sauna and steam room, the facility offers a safe environment with a large green area surrounded by walls.

The unique location combined with high building quality, modern design and professional management will offer you a comfortable lifestyle and guarantee the reliability of your investments.

addition to rich social facilities such as,

  • a fitness centre,
  • outdoor swimming pool,
  • Turkish bath,
  • sauna
  • steam room,
  • the facility offers a safe environment with a large green area surrounded by walls.

Project Profile

project brochure


A-block-basement-floor-plan


A-block-ground-floor-plan


A-block-mezanine-floor-plan


A-block-4th-floor-plan


A block roof floor plan


A-block-normal-floor-plan


Project Features / Amenities

addition to rich social facilities such as,

  • a fitness centre,
  • outdoor swimming pool,
  • Turkish bath,
  • sauna
  • steam room,
  • the facility offers a safe environment with a large green area surrounded by walls.
Price Starts from 166000 Price Ends On 525000

Want to know the latest pricing?
Fill out the form

1+1 apartment

Total: 23
Available: 12
I am Interested

2+1 apartment

Total: 15
Available: 6
I am Interested

2+1 duplex

Total: 3
Available: 2
I am Interested

3+1 duplex

Total: 4
Available: 2
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.