Nordic Sky

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Nordic Properties

Project Gallery

Nordic Sky


The bright and modern residential complex Nordic Sky meets the needs of the most selective byers of real estate on the Alanya coast and is distinguished by its laconic architecture and the comfort of an elite five-star hotel.Life in Tosmur does not stop for a minute, there are supermarkets, vegetable, grocery and souvenir shops, pharmacies, ATMs, bakeries, and other necessary facilities everywhere. Rushing in winter and slower in summer, the Dim river brings a refreshing touch and creates a special atmosphere in the area.

Nordic Sky will be built in accordance with European standards using technologies and high-quality materials. All apartments are provided in a fine finish.

Nordic Sky consists of three blocks of 135 apartments of various layouts Land area is 6678 m2. You can choose from:

  • 1 + 1 (one bedroom apartments) 58-59,5 m2;
  • 2 + 1 (two bedrooms apartments) 98-102 m2;
  • Duplexes 2 + 1 (duplex apartments with two bedrooms) 114,5 m2;
  • Duplexes 3 + 1 (duplex apartments with three bedrooms) 151-160 m2;
  • Duplexes 4 + 1 (duplex apartments with four bedrooms) 231,5-242 m2.

Characteristics of the apartments:
• Ceiling height 3 m;
• Steel entrance door, quality lacquered interior doors;
• Walls painted with washable paint;
• Panoramic double glazed windows with aluminum profile;
• Floor covering - porcelain stoneware/ceramic tiles;
• Kitchen set in wood covered MDF with granite or marble top;
• High quality bathroom equipment;
• Fully equipped bathrooms with shower cabins;
• Electric floor heating in bathrooms;
• A possibility of a heating system installation;
• Video intercom, sockets for internet and IP TV;
• External units of air conditioners are placed in technical rooms at the back facade of the building;
• "Smart Home" system in the basic configuration;
• Additional water filtration system for the residential complex;

LOCATION:

Life in Tosmur does not stop for a minute, there are supermarkets, vegetable, grocery and souvenir shops, pharmacies, ATMs, bakeries, and other necessary facilities everywhere. Rushing in winter and slower in summer, the Dim river brings a refreshing touch and creates a special atmosphere in the area.

  • Distance to Antalya Airport: 130 km
  • Distance to Gazipasa Airport: 35 km
  • Distance to the center of Alanya: 6 km
  • Distance to the sea: 245 m
  • Distance to shops, cafes, restaurants and other facilities: 50 m
  • Distance to farmers market on Thursdays: 800 m

Completion of the construction is planned 28 months, For residential complex Nordic Sky, we offer an interest-free installment plan for 24 months with a down payment of only 30% of the total value of the property.


Project Profile

Project Information


A-block-1st-floor


B-block-ground-floor


B-block-1st-floor


B-block-2,3,4,5,6,7-floor


B-block-8th-floor


B-block-roof-floor


C-block-basement


C-block-ground-floor


C-block-1,2,3,4,5,6,7-floor


C-block-8th-floor


C-block-roof-floor


detail-plan


car parking


Project Features / Amenities

The residential complex Nordic Sky has a large territory and excellent own social area for rest and comfortable living, the variety wide selection of facilities:
• Outdoor swimming pool (370 m2) with water sliders;
• Children's pool (37 m2) ;
• Indoor heated pool (54 m2) with Jacuzzi;
• Gym (92m2) ;
• Turkish bath (hammam) ;
• Sauna;
• Steam room;
• Massage room;
• Lobby and lounge area with bar;
• Play room with billiards and table tennis;
• Playstation area;
• Mini cinema;
• Children’s playground;
• Landscaped garden with fountains;
• Outdoor and indoor parking, including places for bicycles;
• Storage rooms;
• Caretaker;
• Two elevators in each block;
• Electricity generator;
• Security camera system;
• Satellite TV;
• Tennis court.

Price Starts from 225500 Price Ends On 452500

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.