NOVITA KONAKLARI

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Sonmez Construction

Project Gallery

NOVITA KONAKLARI


Novita Konakları – Alanya, Oba is a modern residential project that will offer a lot to both those who vacation in the Mediterranean and those who decide to live here throughout the year. This modern housing project consists of seven-storey (5-storey) buildings, and the backyard has a green area with a landscape view worth seeing.

In our project: open-air swimming pool (200 square meters), indoor pool (40 square meters), water slides, playground, a beautiful green area, parking lot, gazebos, a bar by the pool, fitness room, sauna, steam room Meeting room, cinema, game room, central satellite system, intercom, electric generator. There are wide social areas such as 24/7 security (TV, concierge), concierge service and facilities that will make our lives easier. Apartments in our project vary between 64 and 229 square meters.

PROJECT LOCATION:

* Distance To hospital 20 m (across the road)

* Distance to the dental clinic 30 m

* Distance to new bypass road 500 m

* Distance to the existing bypass road 700 m

* Distance to the hypermarket Metro 750 m

* Distance to the store Kochtash (Turkish analogue Ikea) 700 m

* Distance to the new City Hall municipality (will soon build, approximate time of construction 2 years) 1.5 km

* Distance to Alanya Shopping Center 1.9 km

* Distance to the private school TED (one of the best in Alanya) 200 m

* Distance to the sea is 1.15 km

APARTMENT SIZE:

The square of the apartments 1+1 Net: 52,50 m2. (Gross with a balcony 64 m2)

The square of the apartments 2+1 Net: 79,80 m2. (Gross with a balcony 97 m2)

Penthouse 3+1 with a separate kitchen Net: 132,70 m2. (Gross with 160 m2 balcony), east side

Penthouse 3+1 with a separate kitchen Net: 129,10 m2. (Gross with 157 m2 balcony), west side

Penthouse 2+1 Net: 98 m2. (Gross with balcony 120 m2)

Penthouse 3+1 Net: 153,5 m2. (Gross with balcony 183 m2)

Penthouse 4+1 Net: 202,5 m2. (Gross with balcony 225 m2)

COMMERCIAL SPACES AREA:

Basement: 112 m2

Ground floor: 130 m2

TOTAL: 242 m2

 


Project Profile

project information


A-block-1st-floor


A-block-2nd-floor


A-block-3rd-floor


A-block-basement-floor


A-block-ground-floor


A-block-roof-floor


B-block-1st-floor


B-block-2nd-floor


B-block-3rd-floor


B-block-basement-floor


B-block-ground-floor


B-block-roof-floor


E-block-basement-floor


E-block-ground-floor


Project Features / Amenities

  • Outdoor Swimming Pool
  • indoor swimming pool 
  • aquapark,
  • children's playground,
  • garden,
  • outdoor
  • car park,
  • camellia,
  • pool bar,
  • fitness room,
  • sauna,
  • steam room,
  • dressing cabins for men & women,
  • pool showers
  • toilets,
  • meeting room,
  • TV room
  • game room,
  • concierge,
  • central satellite system,
  • intercom system,
  • generator,
  • wireless internet access,
  • barbecue area,
  • 7/24 security.
Price Starts from 750000 Price Ends On 790000

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.