Oba SoLGarden

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Em Yapı Construction

Project Gallery

Oba SolGarden Residence


The facility will consist of 5 blocks in an oval circle with 64 apartments in different sizes, ranging from 1 + 1 to a penthouse 4 + 1, where all will have well-thought-out designs with a choice of materials for the design-conscious. Some of the apartments will have a ground terrace and all apartments will have the sun on their terraces during the day. The pool and garden area will also have sun all day as this is taken into account when placing the blocks. The apartments can otherwise be used all year round and can provide a relaxing winter holiday.


In the common areas you will find an indoor swimming pool for adults and children, a fitness center where you can work out while the children are in the pool or play billiards, as well as a sauna, hamam, jacuzzi and café. The outdoor area has a large adult pool with ample space for sun loungers, a children's pool and a
playground. There will also be parking spaces for cars at the main entrance to the facility.


Project prices will range from 79,000 euros to 299,000 euros. The early buyer will have the opportunity to design his apartment.


Upon purchase there will be a 30% payment at the conclusion of the contract and the rest over 18 months of payments.


For those who know the area in Oba, the facility is located between Green Park and Toros Oasis in the eastern part of Oba towards Tosmur. The resort is only 850 m from the beach. There is easy access to public transport (bus) which takes you to Alanya about 5 km, 37 km to Gazipaşa airport, and 130 km to Antalya airport.


Project Profile

Oba SolGarden info


A Block 0


A Block 1


A Block 2


A Block 3


D Block 3C


D Block STANDARD


E Block 0


E Block01


E Block 1


E Block 2


E Block3


Project Features / Amenities

The facility has the following;
• Indoor and outdoor swimming pools
• Water slides
• Sunbeds
• Sauna
• Turkish bath
• Fitness center
• Café
• Games Room
• Massage room
• Playground for children

Price Starts from 140000 Price Ends On 299000

Want to know the latest pricing?
Fill out the form

2+1 A-Block-Ground Floor

Total: 2
Available: 2
I am Interested

2+1 A-Block-First Floor

Total: 3
Available: 3
I am Interested

(2+1, 3+1) A-Block-Second Floor

Total: 2
Available: 2
I am Interested

Bsaement, Ground, First & Second Floor D-Block

Total: 16
Available: 5
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.