Victory Park Oba

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Kyt Yapi

Project Gallery

Victory Park Oba


Stunning with its architecture, a new complex in Oba, Alanya. Alanya attracts residents with long hot summers and warm winters. Many shops and bars are open all year round, which makes winter holidays as comfortable and easy as summer ones.

 This brand new complex is located in the heart of the developing Oba district.

The houses stand out from the masses with ultramodern architecture and attractive design features!

The Oba district has preserved most of the forest space with pine trees and orange groves filling the air with spring fragrance; it is really magnificent here.

Oba district has a well-developed transport system and infrastructure with a wide selection of shops, bars and restaurants. Where this complex is located, the infrastructure is in its infancy, although small local shops selling all everyday amenities are just around the corner. The main public hospital and several well-known private hospitals are located in this area. For those who want to move here permanently with their family, there is a good selection of public and private schools and colleges, medical offices, pharmacies and banks.

A regular bus service will take you to the center of Oba or nearby Alanya. The beaches in Oba are among the best on this coast, with soft sand and gentle slopes into the sea, which makes it ideal for families and people with disabilities.

There are beach bars and water sports stations around, there is something to entertain you and your family.

Distance to amenities

To the beach: 2.2 km

To the city: 1.8 km

Antalya International Airport is 131 km away.

Gazipasa Local Airport is 40 km away.

To local shops and markets: 760 m

Apartment Features

This stunning new complex will appeal to those who are looking for a luxury home with excellent amenities. The design is excellent, with earthy, green and natural tones reflected in the exterior and interior spaces.

 

The complex consists of three apartment buildings with 82 apartments on a large plot of land (5293,33m2).

There are a number of great apartments to choose from:

  • 1+1 apartments ranging from 47 to 55 square meters
  • 2+1 duplexes ranging from 91 square meters to spacious 105 square meters.

 

Each beautiful apartment has been designed to appeal to those who are looking for luxury, elegance and great design. The ceiling height is 2.7 m with spot light on the ceiling.

Open-plan kitchens will have enough space for cabinets and countertops to satisfy the most picky chefs.

The elegant bathrooms are equipped with high-quality plumbing fixtures, creating a modern atmosphere that is reflected throughout the house. The bathrooms are equipped with underfloor heating as standard, and are also fully equipped: toilet, sink, lockers, showers.

Curved balconies with glass tops frame the facade of the building, giving it a sinuous and unique look and aesthetics.

They overlook the stunning countryside with views of the Taurus Mountains. They provide additional space for entertaining family and friends or for a morning cup of coffee while admiring the sunrise.

The exterior space is magnificent, with tropical plantings and gardens that seem like small peaceful oases. There is something to entertain you and your family: a large beautiful swimming pool, indoor playgrounds for children and a luxurious SPA center for complete relaxation and rejuvenation.

Living here will give you and your family a comfortable and luxurious lifestyle under the warm Mediterranean sun, and it can so easily become yours. Call one of our experienced sales professionals and let's start the life of your dreams!


Project Profile

project profile


ground+1+2 floor-plan


ground+1+2-numbring-plan


3rd-floor-duplex-plan


3rd-floor-duplex-plan-numbring


roof-floor-plan


roof-floor-numbring-plan


B-block-social-area-plan


C-block-social-area-plan


Project Features / Amenities

Apartment Facilities

open-plan kitchens

topquality sanitary bathroom

bathrooms have under-floor heating as standard

curving glass-topped balconies

Social Facilities

swimming pool

covered play areas for the kiddies

luxury SPA area

gym

bar

elevators

suana

masaj centre

play room for elders

Price Starts from 135000 Price Ends On 299500

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.