Elisya Kestel

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Akr Group Construction

Project Gallery

exterior view


Elisya Project is located in the Kestel region where there are beaches, mountains and green forests.

Elisya, which is built on 1,338 square meters, is close to the street, but also very close to the beach and Dim River.

Dim River is a famous region in Alanya with the most beautiful shades of nature and natural beauties.

This residential project, consisting of 5 floors and 20 apartments, offers living spaces from 1+1 to 4+2, with duplex options.

In this modern building, social area opportunities are also offered.

LOCATION FEATURES

•        Location: Kestel/Alanya/Turkey

•        Distance to the Sea: 750 m

•        Distance to Alanya City Center: 6 km

•        Distance to Gazipaşa Airport: 35 km

•        Distance to Antalya Airport: 120 km

SECURITY

•        Audio-visual door phone

•        Separate flat for doorman

•        7/24 camera system

GENERAL

•        Central Satellite system

•        Elevators

•        Double glazed PVC Windows

•        Recessed spotlights

•        Solid (Hard) steel entrance door

•        Specially designed interior doors

•        Granite ceramic coating in all rooms

•        Exterior sheathing and insulation works

KITCHEN

•        Specially designed modular kitchen furniture

•        Granite kitchen counter

•        Granite-ceramic floor covering

BATHROOM

•        Bordered ceramic floors and walls

•        Shower cabin

•        Electric geyser

BALCONY

●       Balcony-Glass and aluminum railing

●       Ceramic coating and exterior lighting

 


Project Profile

Project Information


1st-floor


2nd-floor


3rd-floor


attic-floor


basement-plan1


basement-plan2


ground-floor


Project Features / Amenities

LEISURE ACTIVITIES

•        Adult Swimming Pool/ Children's Pool

•         Gym

•         Sauna

•         Steam Room

•         Closed Parking Area

•         Resting Areas

•        Generator

•        Wireless internet access in common areas

Price Starts from 176000 Price Ends On 402000

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.