kalan imperium

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: TK Yapi

Project Gallery

Kalan Imperium


The premium-class complex with the infrastructure of a five-star hotel and apartments consists of two 5-storey blocks on a total area of 1.426 m2.

Kalan İmperium reflects the glorious life in its most passionate form to its architecture.The apartments with sea views, from material to design, bring together the quality of the life of prestige owners in their visuals.

Excellent location and transport accessibility!
 

  • in the center of Alanya
  •  commencement of construction - october 2021.
  •  completion of construction - october 2023.
  •  outdoor pool
  •  pool bar
  •  children's swimming pool
  •  indoor pool
  •  spa center reception
  •  Turkish bath (hamam)
  •  sauna
  •  rest zone
  •  changing rooms, showers, toilets
  •  lobby
  •  reception
  •  gym
  •  playground for children
  •  playroom for children
  •  cinema
  •  café
  •  landscaped garden
  •  lounge area
  •  24-hours security service
  •  video surveillance system
  •  indoor parking for 29 cars
  •  satellite system and internet
  •  uninterruptible power supply generator
  •  business office
  •  service office (transfer, car rental, etc.)

In the apartment:

  • air conditioner
  •  steel front door
  •  double aluminium glazing on the windows
  •  interior doors
  •  built-in wardrobe
  •  built-in kitchen with granite worktop
  •  equipped bathroom (shower, Italian bathroom fixtures, built-in furniture, wall mirror)
  •  basic and decorative lighting system
  •  flooring - top quality ceramic tiles
  •  walls - washable paint
  •  sockets and switches
  •  TV cable
     

Project Profile

project brochure


block-A-(1+1-apartment) type-1


block-A-(1+1-apartment) type-2


block-A(2+1-apartment) type-1


block-A(2+1-apartment) type-2


block-A-(2+1 duplex)


block-A(3+1 duplex)


block-A(3+1 duplex)(25)


block-A(3+1 duplex)(27)


block-A(3+1 duplex)(28)


Project Features / Amenities

  • in the center of Alanya
  •  commencement of construction - october 2021.
  •  completion of construction - october 2023.
  •  outdoor pool
  •  pool bar
  •  children's swimming pool
  •  indoor pool
  •  spa center reception
  •  Turkish bath (hamam)
  •  sauna
  •  rest zone
  •  changing rooms, showers, toilets
  •  lobby
  •  reception
  •  gym
  •  playground for children
  •  playroom for children
  •  cinema
  •  café
  •  landscaped garden
  •  lounge area
  •  24-hours security service
  •  video surveillance system
  •  indoor parking for 29 cars
  •  satellite system and internet
  •  uninterruptible power supply generator
  •  business office
  •  service office (transfer, car rental, etc.)

In the apartment:

  • air conditioner
  •  steel front door
  •  double aluminium glazing on the windows
  •  interior doors
  •  built-in wardrobe
  •  built-in kitchen with granite worktop
  •  equipped bathroom (shower, Italian bathroom fixtures, built-in furniture, wall mirror)
  •  basic and decorative lighting system
  •  flooring - top quality ceramic tiles
  •  walls - washable paint
  •  sockets and switches
  •  TV cable
Price Starts from 285000 Price Ends On 1100000

Want to know the latest pricing?
Fill out the form

1+1 apartment

Total: 24
Available: 8
I am Interested

2+1 apartment

Total: 17
Available: 9
I am Interested

2+1 duplex

Total: 3
Available: 2
I am Interested

3+1 duplex

Total: 4
Available: 3
I am Interested

4+1 duplex

Total: 2
Available: 2
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.