KAVI Skyland Demirtas

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Akr Group Construction

Project Gallery

exterior view


KAVİ SKYLAND is a project located in the Demirtaş region of Alanya. Demirtaş is one of the quiet and peaceful areas. Kavi Skyland project will be built in coniferous forests and clean nature. It is a very good investment to start the day against the sea, which is only 1200 m away.

KAVİ SKYLAND will be located on an area of 4.227 square meters and will consist of 1 block, 7 floors and a total of 72 flats. There are apartment options that offer living space from 49 square meters to 138 square meters.

We have a variety of apartment options available:

·       1+1 flats

·       2+1 flats

·       2+1 and 3+1 garden and penthouse duplex flats

All apartments are presented with high quality finishing, plumbing materials and kitchen furniture.

The area will be decorated with decorative garden and green areas.

Do not miss the investment opportunity for a peaceful and comfortable life with the KAVİ SKYLAND project.

LOCATION FEATURES

• Location: Demirtaş/Alanya/Turkey

• Distance to the Sea: 1200 m

• Distance to Alanya City Center: 23 km

• Distance to Gazipaşa Airport: 15 km

• Distance to Antalya Airport: 159 km

SECURITY SYSTEM

• Fenced and protected area

• The flat reserved for the officer

• 7/24 camera system

TECHNICIAL SPECIFICATIONS

• Central Satellite system and Internet

• Elevators

• Double glazed PVC Windows

• Recessed spotlights

• Solid (Hard) steel entrance door

• Specially designed interior doors

• Ceramic and marble flooring

• Sound and heat insulated double wall

KITCHEN

• Specially designed modular kitchen furniture

• Granite kitchen counter

• Granite-ceramic floor covering

BATHROOM

• Bordered ceramic floors and walls

• Shower

• Electric geyser

BALCONY

• Balcony-Glass and aluminum railing

• Ceramic coating and exterior lighting


Project Profile

Project Information


8th-floor


basemet-plan


ground-floor


normal-floor


roof-plan


social-plan


Project Features / Amenities

Adult Swimming Pool/Children's Pool

• Heated Indoor Swimming Pool

• Turkish bath

• Sauna

• Massage Room

• Showers and Changing Rooms

• Resting Arbors and Barbecue Area

• Gym

• Mini Club

• Tennis court

• Open Parking Area

• Generator

• Wireless internet access in common areas

Price Starts from 128000 Price Ends On 240000

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.