Oba Twins

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Tokus Insaat

Project Gallery

OBA Twins


 Oba town has become an elite life center that develops with shopping centers, health centers, schools, social activity areas, culture and sports centers, which are the brand values ​​of Alanya, and with its low-rise development plan, you will be away from the stress of the city, peaceful and comfortable offers a life

OBA TWINS Project Land belongs to our company and offers you a comfortable and safe living space in the center of the city with its modern architecture, rich social areas and luxury apartment models.

We dreamed of a house where your children can freely live their childhood in lush gardens, experience the excitement of the first day while returning home every day and where you will be very happy with your loved ones. Gardens will surround your house with its landscape carefully prepared by imagining a life intertwined with nature, and lush plants will give you the feeling of wandering in nature.

  • Exterior pool
  • Children pool
  • Pool Bar -Shower-WC
  • Beautiful garden with palm, flower and fruit trees
  • Car park
  • Basket and Football playground
  • Children's Playground
  • Camellia
  • Fitness Center
  • Sauna
  • Steam room
  • Cafe-Bar
  • Central Satellite
  • Generator
  • Caretaker

 

Building Features:

  • Building with Energy Identity
  • Exterior JOTUN Paint
  • Tile Roof
  • Decorative Stone  Veneer
  • Decorative Aluminum Entry Door
  • Camera Door bell
  • Post box
  • Modern Elevator
  • Building Entrance Decorative Hidden Light Ceilings
  • Marble Flooring in Interior Halls
  • Sound Insulation Between Neighboring Flats

 

Apartment Features:

  • Steel door
  • Doorphone
  • Suspended Ceiling Decorative Concealed Light
  • Interior Walls paint Filli Boya brand
  • American Panel doors
  • Windows and Sliding Doors PVC
  • Window and Sliding Door Glasses ISICAM KOMFOR brand
  • Room Floors 8mm VARIO Brand Laminate
  • Kitchen Cabinet Doors HIGH GLOSS brand
  • LED Light over/under Kitchen Top
  • Kitchen Drawers with Stop mechanism
  • Kitchen Under Counter Ceramic
  • Kitchen Sink
  • Bathroom Walls and Floors Waterproofing
  • Bathroom Walls and Floors are ceramic
  • Toilet Seat - Washbasin - Shower in Bathrooms
  • Sufficient Electric Switch + Socket + Satellite Antenna + Telephone Infrastructure in the Rooms
  • Balcony Floors Waterproofing
  • Balcony floors are ceramic
  • Electric hot water heating system
  • Multi System Air Conditioning infrastructure

You will be able to have a pleasant time sipping your tea with your friends in our comfortable social areas.

OBA TWINS OFFERS YOU MORE THAN  HOME.


Project Profile

Project Brochure


A-BLOCK-FLOOR


B-BLOCK-FLOOR


DUPLEX-LOWER-FLOOR


DUPLEX-TOP-FLOOR


NORMAL-FLOOR-PLAN


Project Features / Amenities

  • Exterior pool
  • Children pool
  • Pool Bar -Shower-WC
  • Beautiful garden with palm, flower and fruit trees
  • Car park
  • Basket and Football playground
  • Children's Playground
  • Camellia
  • Fitness Center
  • Sauna
  • Steam room
  • Cafe-Bar
  • Central Satellite
  • Generator
  • Caretaker

 

Building Features:

  • Building with Energy Identity
  • Exterior JOTUN Paint
  • Tile Roof
  • Decorative Stone  Veneer
  • Decorative Aluminum Entry Door
  • Camera Door bell
  • Post box
  • Modern Elevator
  • Building Entrance Decorative Hidden Light Ceilings
  • Marble Flooring in Interior Halls
  • Sound Insulation Between Neighboring Flats

 

Apartment Features:

  • Steel door
  • Doorphone
  • Suspended Ceiling Decorative Concealed Light
  • Interior Walls paint Filli Boya brand
  • American Panel doors
  • Windows and Sliding Doors PVC
  • Window and Sliding Door Glasses ISICAM KOMFOR brand
  • Room Floors 8mm VARIO Brand Laminate
  • Kitchen Cabinet Doors HIGH GLOSS brand
  • LED Light over/under Kitchen Top
  • Kitchen Drawers with Stop mechanism
  • Kitchen Under Counter Ceramic
  • Kitchen Sink
  • Bathroom Walls and Floors Waterproofing
  • Bathroom Walls and Floors are ceramic
  • Toilet Seat - Washbasin - Shower in Bathrooms
  • Sufficient Electric Switch + Socket + Satellite Antenna + Telephone Infrastructure in the Rooms
  • Balcony Floors Waterproofing
  • Balcony floors are ceramic
  • Electric hot water heating system
  • Multi System Air Conditioning infrastructure
Price Starts from 135000 Price Ends On 249000

Want to know the latest pricing?
Fill out the form

2+1 Apartments

Total: 6
Available: 3
I am Interested

3+1 Apartments

Total: 12
Available: 4
I am Interested

3+1 Duplex Apartments

Total: 2
Available: 1
I am Interested

4+1 Duplex Apartments

Total: 4
Available: 2
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.