Ruby Twins

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Ruby Alanya Construction

Project Gallery

Ruby Twins


Luxury design and comfortable facilities welcomes you as your second or vacation home. Ruby Twins locates in the center of Mahmutlar and just 600 meters a way from the sea.
Ruby Twins offering a luxury life and a profitable investment because of its valuable location.
Construction of Ruby twins begins on January 2022 and planned to be completed on December 2023 .
1+1 and 2+1 flat floors, 3+1 and 4+1 on duplex floors.
The sizes of the units are from 55 to 65 sim for 1+1 flats, 110 sqm for the 2+1 flats, further more all the units are facing to the south.

  • Indoor and Outdoor swimming pools
  • Turkish Bath
  • Massage Rooms
  •  Steam Room
  •  Sauna
  •  Fitness Center
  •  Water Slides for the swimming pool
  •  Children playground inside and outside
  • Bbq pergola
  •  Pool Bar and Cafe
  •  Generator
  • Outdoor car parking
  • 24/7 CCTV camera system
  •  Security
  • Caretaker
  •  Football field
  •  Basketball field
  •  Tennis court

Project Profile

project brochure


A-block-normal-floor


A-block-social-area


A-block-lower-duplex


B-block-normal-floor


B-block-social-area


B-block-lower-duplex


B-block-upper-duplex


Project Features / Amenities

  • Indoor and Outdoor swimming pools
  • Turkish Bath
  • Massage Rooms
  •  Steam Room
  •  Sauna
  •  Fitness Center
  •  Water Slides for the swimming pool
  •  Children playground inside and outside
  • Bbq pergola
  •  Pool Bar and Cafe
  •  Generator
  • Outdoor car parking
  • 24/7 CCTV camera system
  •  Security
  • Caretaker
  •  Football field
  •  Basketball field
  •  Tennis court
Price Starts from 132000 Price Ends On 275000

Want to know the latest pricing?
Fill out the form

1+1 apartment,

Total: 77
Available: 18
I am Interested

2+1 apartment,

Total: 33
Available: 5
I am Interested

2+1 duplex

Total: 5
Available: 3
I am Interested

3+1 duplex

Total: 3
Available: 1
I am Interested

4+1 duplex

Total: 2
Available: 1
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.