Sonas Sayar Mahmutlar

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Topcu Grup

Project Gallery

Sonas Sayar


A modern residential complex is well located in the central part of the popular resort district of Alanya, Mahmutlar. A beautiful sandy beach and a well-maintained promenade are located just 600 meters from the residence. The size of the land plot on which the complex will be built, is 1600 m2. Developed infrastructure, close proximity to various cultural and domestic facilities destination, green surroundings with mountain scenery, orange and banana groves along will be appreciated by both lovers of a relaxing holiday, and those who prefer an active image life. The residence consists of two five-story buildings, where two-, three-room apartments and penthouses. You can choose the layout that suits you best. apartments from the available options. The complex has a fenced protected area, an outdoor swimming pool with a children's section, a garden with flowers, palm trees and ornamental plants, fitness room, sauna and more. The maintenance of the territory of the complex will be carried out by the house manager. Unique location combined with high quality development, modern design and professional management will provide you with a comfortable lifestyle and guarantee the safety of your investment. In the construction of the complex, only certified materials were used that meet international quality standards.

TECHNICAL CHARACTERISTICS OF THE APARTMENTS

• Steel entrance doors

• Internal MDF doors

• Wardrobe in the hallway

• Fitted kitchen

• Granite countertop in the kitchen

• Built-in furniture in the bathroom

• Top class ceramic tiles in the bathroom

• Shower cabin

• Walls painted with top quality Filli paint

• Spotlights

• In other rooms - finishing the ceiling with plasterboard

• PVC plastic windows

• Ceramic floor on the balcony

• Balcony glass railing and aluminum railing


Project Profile

Project broucher


1to3-floorplan-ABlock


basment-plan-ABlock


duplex-floorplan-ABlock


ground-floorplan-ABlock


roof-plan-ABlock


1to3-floorplan-B-Block


basement-plan-B-Block


duplex-floorplan-B-Block


ground-floorplan-B-Block


roof-plan-B-Block


Project Features / Amenities

• Open pool

• Children's swimming pool

• Central satellite system

• Generator

• Security cameras

• Garden

• Automatic gate at the entrance

• Cipher lock at the entrance

• Video intercom

• Gym

• Sauna

Price Starts from 130000 Price Ends On 335000

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.