Bayar Residance

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: BAYAR HOMES

Project Gallery

Bayar Residance


Taurus Mountains, whose height exceeds 2 thousand meters, takes on a snow mantle in winter. With the spring, 20 streams of Alanya carry the melting snow waters in the mountains to the Mediterranean, and meanwhile, beautiful picnic areas and rafting tracks are formed in the valleys. The highlands in the mountains have a rich flora. There are ideal areas for both jeep safari and trekking. Only in Alanya Castle 16 endemic plant species grow.
 

About the Project ;

Our project, which has a five-star hotel infrastructure, is a single block built on 2149 m² and consists of 31 flats. There are 12= 1+1 (53 m²), 12 = 2+1 Flat feet (93 m²), 5 = 2+1 Dublex (100-122 m²) and 2 = 4+1 Dublex (202-208 m²). Bayar Residence reflects the magnificent life in its most passionate way to its architecture. Sea view apartments, from their materials to their design, bring the quality of life of prestige owners together with their visuals. 
24 hours live table! ,

Construction Start Date: 30/10/2022 ,,Construction Completion Date: 30/04/2024

30% down payment for 1+1's,, 40% down payment for 2+1's,, 50% down payment for 4+1's,, until the end of construction interest-free installments.

project features are;

  • Gym
  • Turkish bath
  • Spa
  • Sauna
  • Indoor pool
  • Swimming pool
  • Children's Swimming Pool
  • Indoor Playgrounds
  • Wireless Internet (Wi-Fi)
  •  Satellite TV
  •  Generator
  •  Doorman / Gardener
  •  Central Water Treatment System
  •  Car park
  •  24/7 Security and Video Surveillance System

Project Profile

project brochure


situation-plan


social-area-plan


normal-floor-plan


normal-floor-calculation-plan


roof-floor-plan


roof-floor-calculation-plan


duplex-floor-plan


duplex-floor-calculation-plan


Project Features / Amenities

  • Gym
  • Turkish bath
  • Spa
  • Sauna
  • Indoor pool
  • Swimming pool
  • Children's Swimming Pool
  • Indoor Playgrounds
  • Wireless Internet (Wi-Fi)
  •  Satellite TV
  •  Generator
  •  Doorman / Gardener
  •  Central Water Treatment System
  •  Car park
  •  24/7 Security and Video Surveillance System
Price Starts from 185000 Price Ends On 875000

Want to know the latest pricing?
Fill out the form

1+1 apartment

Total: 12
Available: 12
I am Interested

2+1 apartment

Total: 12
Available: 7
I am Interested

2+1 duplex

Total: 5
Available: 5
I am Interested

4+1 duplex

Total: 5
Available: 5
I am Interested

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.