FLAT 20 Kestel

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Akr Group Construction

Project Gallery

outdoor


The new cozy FLAT 20 PROJECT is located in the exclusive, non-polluting, developing Kestel district of Alanya, Turkey, just 150 meters from the ocean, where there are endless beaches, mountains, green forests in the Kestel district.

FLAT 20 PROJECT will be spread over ​​1,900 m² and will consist of One 4-storey residential block with totally 20 apartments and commercial real estate on the first floor.

The complex offers a wide selection of one-bedroom apartments; comfortable and spacious apartments with two bedrooms and luxurious two-story duplexes with three-four bedrooms

All apartments are rented with high-quality finishing, plumbing fixtures, kitchen sets.

The infrastructure of the complex will include an outdoor pool, outdoor parking, sauna, fitness center, 7/24 security, cameras, power generator and free wireless in the social area.

FLAT 20 PROJECT offers secure, luxurious, high quality modern designs and living areas with many social activities available in the middle of the heart of Ketsel district.

LOCATİON FEATURES:

•           Location: Kestel, Alanya, Turkey. 

•           Distance to beach: 150 m

•           Distance to Alanya city centre: 2 km

•           Distance to Gazipasha airport: 30 km

•           Distance to Antalya airport: 125 km

The new cozy FLAT 20 PROJECT is located in the exclusive, non-polluting, developing Kestel district of Alanya, Turkey, just 150 meters from the ocean, where there are endless beaches, mountains, green forests in the Kestel district.

FLAT 20 PROJECT will be spread over ​​1,900 m² and will consist of One 4-storey residential block with totally 20 apartments and commercial real estate on the first floor.

The complex offers a wide selection of one-bedroom apartments; comfortable and spacious apartments with two bedrooms and luxurious two-story duplexes with three-four bedrooms

All apartments are rented with high-quality finishing, plumbing fixtures, kitchen sets.

The infrastructure of the complex will include an outdoor pool, outdoor parking, sauna, fitness center, 7/24 security, cameras, power generator and free wireless in the social area.

FLAT 20 PROJECT offers secure, luxurious, high quality modern designs and living areas with many social activities available in the middle of the heart of Ketsel district.

LOCATİON FEATURES:

•           Location: Kestel, Alanya, Turkey. 

•           Distance to beach: 150 m

•           Distance to Alanya city centre: 2 km

•           Distance to Gazipasha airport: 30 km

•           Distance to Antalya airport: 125 km

 SECURITY & SAFETY

●        Audio-visual Door Phone

●        24/7 security and camera system in the complex

●        Gardener and Caretaker

GENERAL

●        Central TV-Satellite System 

●        Internet in social area

●        Lifts 

●        PVC Windows Double Glazed

●        Built-in Spot Light at local area

●        Solid steel entrance door

●        Special design style internal doors

●        Granite-ceramic tile flooring in all rooms

●        Each Room Includes Air Conditioner

●        Exterior thermal sheathing and insulation works

 KİTCHEN

●        Custom designed modular kitchen furniture

●        Granite worktop

●        Granite-ceramic floor tiles

 BATHROOM

●        Bordered ceramic floor and walls 

●        Electric floor Heating

●        Shower cabin

●        Instant Electric Water Heater

 BALCONY

●        Well-proportioned balconies with glass and aluminum handrail

●        Ceramic flooring and external lighting


Project Profile

Project Catalog


1st-floor


2nd-floor


3rd-floor


attic-floorplan


Project Features / Amenities

LEISURE FACILITIES

●        Swimming pool & Children's pool 

●        Sauna

●        Fitness center

●        Power Generator 

●        BBQ Areas 

●        Wireless Internet in Common Areas

●        Gazebo for rest

Price Starts from 119000 Price Ends On 270000

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.