KAVI VELUX is a luxury real estate investment in the Mediterranean region Alanya/Kargicak.

Our project is 16 km from Alanya city center and 2 km from the sea, and will also be located among the banana gardens.

Our project, which will incorporate the cool breeze of the Taurus Mountains, will be built on 7.900 m² of land.

The 6-storey complex with a large social area will consist of 3 blocks, with a total of 64 flats, and there are options that offer living spaces of different plans from 49 m² to 170 m².

Our apartments in the form of 1+1, 2+1, 2+1 garden floor duplex, 2+1 penthouse duplex, 3+1 garden floor duplex, and 3+1 penthouse duplex will be offered to the satisfaction of our valued customers without sacrificing quality.

Invite yourself and your family to a peaceful, modern life with our KAVI VELUX project.

LOCATION FEATURES

• Location: Kargicak/Alanya/Turkey

• Distance to the Sea: 2 km

• Distance to Alanya City Center: 16 km

• Distance to Gazipaşa Airport: 25 km

• Distance to Antalya Airport: 145 km

SECURITY

• Audio-visual door phone

• Separate flat for doorman

• 7/24 camera system

GENERAL

• Central Satellite system

• Elevators

• Double glazed PVC Windows

• Recessed spotlights

• Solid (Hard) steel entrance door

• Specially designed interior doors

• Granite ceramic coating in all rooms

• Exterior sheathing and insulation works

KITCHEN

• Specially designed modular kitchen furniture

• Granite kitchen counter

• Granite-ceramic floor covering

BATHROOM

• Bordered ceramic floors and walls

•Shower cabin

• Electric geyser

BALCONY

●       Balcony-Glass and aluminum railing

●       Ceramic coating and exterior lighting


Project Profile

Project Catalog


1,2-floor-BlockA


3rd-floor-BlockC


basement-plan-BlockB


ground-floor-BlockB


roof-plan-BlockA


1,2-floor-BlockC


basement-plan-BlockC


ground-floor-BlockC


roof-plan-BlockC


Project Features / Amenities

LEISURE ACTIVITIES

• Adult Swimming Pool/ Children's Pool with Slides

• Heated Indoor Swimming Pool

•Turkish bath (Hamam)

• Sauna and Jacuzzi

• Massage Room

• Showers and Changing Rooms

• Resting and Barbecue Area

•Gym

• Mini Club

•Play ground

•Tennis court

• Open and Closed Parking Area

• Generator

• Wireless internet access in common areas

Price Starts from 140000 Price Ends On 336000

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.