Oba Royal Garden

  • ratings
  • ratings
  • ratings
  • ratings
  • ratings
Star Rating 5.0

Project By: Memos Home

Project Gallery

outdoor


ALANYA
The beauty of Alanya draws millions every year to its shores and provides everything you could dream of in a holiday. The county's unique geographical and cultural texture, miles and miles of sandy beaches along the turquoise blue Mediterranean Sea, and the rich tastes of the world renowned Turkish cuisine make it an ideal destination. The possibilities are endless; you can swim in the bay where Cleopatra once bathed, lie back and enjoy the sun, explore the mysterious sea caves on a blue cruise, or soak in the rich heritage of Mediterranean civilizations, the accumulation of millennia.

ABOUT OBA ROYAL GARDEN
Artful and elegant as it rises among the simultaneously vibrant and peaceful neighborhood of Oba, Oba Royal Garden is made for those who seek a tasteful atmosphere and an elegant luxury, either alone or as a family. Situated in the high-rise district of Oba in Alanya, the crown jewel of the Mediterranean seaside towns, Oba Royal Garden promises a life of privilege, opportunity and memorable experiences. Only 850 meters away from the sandy beaches of Alanya, Oba Royal Garden has the unique quality of exclusivity and seclusion while still being central and comfortably accessible. Scattered around the complex are restaurants, cafés, bars, markets and shops, as well as the biggest hospital in the region and various dental care facilities, ophthalmology centers and pharmacies, allowing you to experience a life of privacy and comfort while the world waits outside your door step. 


APARTMENT CHOICES
Consisting of 4 contemporary blocks made with the latest architectural developments and a keen eye for elegance, Oba Royal Garden offers 56 apartments of varying sizes and layouts.
THE SPA
Live above your very own SPA, exhaustively built with top quality features of the finest five star establishments. Turkish bath, steam room, sauna, massage rooms and the lounge area are all yours to enjoy, any time, any season, whenever you want.
Location
Police Department Hospital City Centre
Fresh Market – Bazaar BIM Market Sok Market
KOCTAŞ Department Store METRO Hypermarket Restaurants
Dental Care Clinics Ophthalmologists Pharmacies
Pool View Mountain View Nature View
Distances
3 km Alanya 650 m Oba Centre 200 m Dental Clinic
850 m Beach 250 m Bus Stop 300 m Eye Clinic
250 m Shopping 300 m Restaurants 150 m Market
125 km Antalya Airport 40 km Gazipaşa Airport 250 m General Hospital

APARTMENT TYPES
(You should write a small one sentence description for each of these apartments and add it to the
main Oba Royal Garden Text where I have marked with blue)
● 1+1 American Kitchen 63,5 m2
● 2+1 American Kitchen 107 m2
● 3+1 American Kitchen 127 m2
● 3+1 American Kitchen 134 m2
● 3+1 American Kitchen 129 m2 and 1+0 Studio Flat 26 m2 is+ 155 m2
● 3+1 American Kitchen 164 m2 and 1+0 Studio Flat 34 m2 is + 198 m2
● 3+1 American Kitchen 177 m2 and 1+0 Studio Flat 34 m2 is + 211 m2
● 3+1 Separate Kitchen 192 m2
● 4+1 Separate Kitchen 206 m2
● 4+1 Single Floor Penthouse 230 m2 and 1+0 Studio Flat 20 m2 is + 250 m2


Project Profile

Project Information


1,2,3-Floorplan-BlockD


2nd-floor-BlockA,B,C


3+1-top


4th-floor-BlockA,C


garden-floor


roof-plan


Project Features / Amenities

Handicap Accessible              

Perimeter Wall                             

Auto-Lights

Children’s Playground

Billiards                                          

Sports Centre

Entertainment Room                   

Reception                                      

Gated-Community

Sound Insulation                          

Parking Lot                                     

Cable TV – Satellite

Public Wi-Fi                                   

Security Cameras                         

24/7 Security

Generator                                      

Elevator

Indoor Pool Bar                             

Water Slides                                  

Children’s Pool

Outdoor Pool Bar                         

Outdoor Jacuzzi                            

Outdoor Pool

Fitness Centre                               

Relaxation Room                          

Sauna

Steam Room                                 

Turkish Bath                                  

Garden

Massage Rooms

Price Starts from 260000 Price Ends On 445000

Want to know the latest pricing?
Fill out the form

Get Latest Available Units Information

Free services provided by AP Free for the buyers:

- 1-Lawyer's fees for buyer's counsel
- 2-Resident ship for buyer for 1 year
- 3-Property insurance
Read More.

Interested in this Project!?
Do write us.

Project Location Map

Have you found the perfect property?

Buying a home is one of the biggest decisions you'll have to make in life, and it really pays to do a little research to make sure you choose a home that suits you now and in the future.
Our professional advisors offer a wide range of real estate services, such as mortgage advice, free legal advice and more

Alanya has various interesting areas with many projects on our website such as:

Alanya centre, Asmaca Mh., Avsallar, Bayır Mh., Bektaş Mh., Burçaklar Mh., Büyükhasbahçe Mh., Cikcilli, Cumhuriyet Mah., Çarşı Mh., Dinek Mah., Fığla Mh., Gözübüyük Mh., Güller Pınarı Mh., Gümüşgöze Mh., Hacet Mah., Hacımehmetli Mh., Hisariçi Mh., Kadıpaşa Mh., Kargıcak Mh., Kestel, Kızlar Pınarı Mh., Konaklı Mh., Küçükhasbahçe Mh., Mahmutlar Mh., Okurcalar Mh., Saray Mah., Sugözü Mh., Şekerhane Mh., Tepe Mah., Tophane Mah., Türkler Mh., Yasirali Mh., Beldeler, Çıplaklı Mh., Demirtaş Mh., Emişbeleni Mh., Güzelbağ Mh., Kestel, Mahmutlar Mh., Oba Mh., Payallar,Tosmur Mh., Demirtaş, Şıhlar Mh., İncekum ( Yeşilköy ), İncekum Mh., Köyler,Akçatı Mh., Akdam Mh., Alacami Mh., Alara Mh., Aliefendi Mh., Bademağacı Mh., Basırlı Mh., Başköy Mh., Bayırkozağacı Mh. Beldibi Mh. Beyreli Mh. Bıçakçı Mh. Bucak Mh. Büyükpınar Mh. Çakallar Mh. Çamlıca Mh. Değirmendere Mh. Dere Mh. Elikesik Mh. Fakırcalı Mh. Gözüküçüklü Mh. Gümüşkavak Mh. Güney Mh. Hacıkerimler Mh. Hocalar Mh. İmamlı Mh. İsbatlı Mh. İshaklı Mh. Karakocalı Mh. Karamanlar Mh. Karapınar Mh. Kayabaşı Mh. Keşefli Mh. Kızılcaşehir Mh. Kocaoğlanlı Mh. Kuzyaka Mh. Mahmutseydi Mh. Obaalacami Mh. Orhan Mh. Öteköy Mh. Özvadi Mh. Paşaköy Mh. Saburlar Mh. Sapadere Mh. Seki Mh. Soğukpınar Mh. Süleymanlar Mh. Taşbaşı Mh. Tırılar Mh. Toslak Mh. Türktaş Mh. Uğrak Mh. Uğurlu Mh. Uzunöz Mh. Üzümlü Mh. Yalçı Mh. Yaylakonak Mh. Yaylalı Mh. Yenice Mh. Yeniköy Mh. Yeşilöz Mh.

We will be happy to advise you on how to find the best area for you.

Send a request and let one of our consultants help you.